I want to be sure that I've got this right: A client is moving into a brand-new ESFR protected warehouse space and they want to build a two level bin-box system. I explained that they would have to fire protect below the walkways and they've come back to me asking whether or not building just the lower level of the system would alleviate the need to make sprinkler system improvements. The CMSA and ESFR protection tables in Chapter 14 (2016 edition) don't include bin-box or plastics in the application range, Only palletized and solid pile, Classes 1-4. If they want to use a bin-box system, do they have to change roof sprinklers out for CMDA? Or can the ESFR remain and CMDA sprinklers would be installed under walkways when they're built?
I miss the little bitty book and pipe scheduled systems... [cid:[email protected]] Steve Leyton, President T | 619.255.8964 x 102 | www.protectiondesign.com<http://www.protectiondesign.com/> 2851 Camino Del Rio South | Suite 210 | San Diego, CA 92108 Fire Protection System Design | Consulting | Planning | Training
_________________________________________________________ SprinklerForum mailing list: https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org To unsubscribe send an email to [email protected]