In fairness, the state takes 4-5 months (or more) to do everything. Like the flashing lights at a dangerous intersection just down the road from you. Of course, the flashing lights probably won't do anything to stop people from blowing through the stop sign because they're texting.
-----Original Message----- From: AF <af-boun...@af.afmug.com> On Behalf Of Mike Hammett Sent: Sunday, March 23, 2025 4:02 PM To: AnimalFarm Microwave Users Group <af@af.afmug.com> Subject: Re: [AFMUG] BEAD "it’s the permitting, engineering, fees to every government entity, paperwork, etc. that you have to pay." We don't have any permitting or government fees. That's actually prohibited by state regulation. I haven't found the engineering to be that expensive either, even if contracted out. I have found the permitting delays to be a bitch, though. We're like four or five months waiting on the state to get back to us on a permit. The cities are down to about a 1 - 2 week turnaround. ----- Original Message ----- From: "Mark Radabaugh" <m...@amplex.net> To: "AnimalFarm Microwave Users Group" <af@af.afmug.com> Sent: Friday, March 21, 2025 6:53:57 PM Subject: Re: [AFMUG] BEAD The extra fiber needed to do AE isn’t a big deal when you are building centralized split architecture in mid to dense population areas, but it becomes pretty cost prohibitive quickly in low density and with NG2-PON on the horizon with the capability of delivering 10G/10G over a 40G capacity PON I don’t see much need for AE anytime soon. Why is is so expensive? Fiber isn’t expensive - it’s the permitting, engineering, fees to every government entity, paperwork, etc. that you have to pay. Mark > On Mar 21, 2025, at 4:49 PM, dbernardi <dberna...@zitomedia.net> wrote: > > > > But the expensive/important part (fiber) is in place. If the gubment is > going to piss away tax dollars for unserved/underserved broadband, fiber > construction seems like a decent urinal. > > XGS-PON can co-exist with GPON on the same fiber so eventual upgrades are > fairly easy. Do combo GPON/XGS-PON at the OLT out of the gate so a CPE swap > is the only thing require for an upgrade to a shared 10Gb service. When > XGS-PON isn't enough bandwidth for the 32 subscribers on a PON, I'd rather > replace equipment at either end than deal with another construction project. > Or do a 1:16 split. > > Preparing for AE when doing the construction is probably worthwhile too even > if you only light for PON initially, or mix/match. The cost of deploying > high count fiber cable isn't that significant in the big picture. > > And why does fiber construction have to be so (artificially?) expensive. Buy > America will certainly make broadband deployments more expensive but that's a > good thing if it truly provides jobs and manufacturing investment, but I have > my doubts. > > > > On 3/21/2025 2:04 PM, Josh Luthman wrote: >> Is GPON good enough? That can only do gigabit and each port is 2.5G. >> Should these projects require NGPON? Or maybe every location should have AE >> so they can do 100G to start with. >> On Fri, Mar 21, 2025 at 2:01 PM Steve Jones <thatoneguyst...@gmail.com >> <mailto:thatoneguyst...@gmail.com>> wrote: >> Because in X years they won't be. With fiber they will be upon the >> same Infrastructure. >> On Fri, Mar 21, 2025, 10:59 AM Josh Luthman >> <j...@imaginenetworksllc.com <mailto:j...@imaginenetworksllc.com>> >> wrote: >> But people that currently have fixed wireless of 100x20 are >> sufficiently served? How does that make any sense? >> On Fri, Mar 21, 2025 at 11:44 AM Steve Jones >> <thatoneguyst...@gmail.com <mailto:thatoneguyst...@gmail.com>> >> wrote: >> they should not allow fixed wireless, they never should have >> allowed technology with a short shelf life >> On Thu, Mar 20, 2025 at 9:17 AM Adam Moffett >> <dmmoff...@gmail.com <mailto:dmmoff...@gmail.com>> wrote: >> Well.... >> https://bsky.app/profile/craigsilverman.bsky.social/ >> post/3lkiye5n2dk2p <https://bsky.app/profile/ >> craigsilverman.bsky.social/post/3lkiye5n2dk2p> >> https://www.reddit.com/r/technology/s/seq3uoU1L5 >> <https://www.reddit.com/r/technology/s/seq3uoU1L5> >> The director of BEAD quit. He says the previous rules >> interpreted the bill to mean that only FTTH would meet >> the performance and future-proofing requirements. He is >> claiming that there are proposed rule changes that will >> allow Starlink but not allow fixed wireless. I don't >> know whether the changes /intentionally/ benefit >> Starlink, but this guy is crying foul and felt strongly >> enough about it to resign over it. >> -Adam >> >> ------------------------------------------------------------------------ >> *From:* AF on behalf of Ken Hohhof >> *Sent:* Thursday, March 20, 2025 12:19 AM >> *To:* 'AnimalFarm Microwave Users Group' >> *Subject:* [AFMUG] BEAD >> I’m surprised BEAD hasn’t run into problems because the >> E stands for Equity and DEI is now banned. >> But if they eliminate the E, would it just be BAD? >> -- AF mailing list >> AF@af.afmug.com <mailto:AF@af.afmug.com> >> http://af.afmug.com/mailman/listinfo/af_af.afmug.com >> <http://af.afmug.com/mailman/listinfo/af_af.afmug.com> >> -- AF mailing list >> AF@af.afmug.com <mailto:AF@af.afmug.com> >> http://af.afmug.com/mailman/listinfo/af_af.afmug.com >> <http://af.afmug.com/mailman/listinfo/af_af.afmug.com> >> -- AF mailing list >> AF@af.afmug.com <mailto:AF@af.afmug.com> >> http://af.afmug.com/mailman/listinfo/af_af.afmug.com <http:// >> af.afmug.com/mailman/listinfo/af_af.afmug.com> >> -- AF mailing list >> AF@af.afmug.com <mailto:AF@af.afmug.com> >> http://af.afmug.com/mailman/listinfo/af_af.afmug.com <http:// >> af.afmug.com/mailman/listinfo/af_af.afmug.com> > > > -- > AF mailing list > AF@af.afmug.com > http://af.afmug.com/mailman/listinfo/af_af.afmug.com -- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com -- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com -- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com