We have a tower next to a commercial building, I think it's a 45 or 50 ft
probably Rohn 45G.  It is near a smallish regional airport but pretty much
90 degrees to the runway.  We need to swap out the 5 GHz backhaul links on
this tower for licensed.

 

The frequency coordinator is telling us that according to TOWAIR we need to
file for an ASR, I assume they mean not just with the FCC but with the FAA.

 

By doing so, are we opening Pandora's box, where they tell us not only is
our request denied, we have to take down the tower that has been there for
20 years?  Is this one of those things where we will really regret asking
the question and should have just kept quiet and suffered with the 5 GHz
interference?

-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to