ltage gets too
high. Once the voltage drops the contactor can close and bring the Fronius
back on line and then the 5-minute start up delay before it is feeding the
line again.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berk
the DC diversion side
solution if you have someplace to put the power instead of just the
batteries, although that might be generally less commonly available for
retrofits into existing on-grid households.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401
Hi Mark, Gary,
The Xantrex XW series inverters will do a frequency shift to cause most
models of grid-tied inverter to disconnect when the batteries are full,
while the system is operating in an ac coupled off-grid mode. The
following app-note describes this operation.
Cheers,
Mark
http
I see. Can this function be enabled/diabled?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenche
Hi Mark,
The point of operation can be adjusted above normal battery operating
levels, which essentially disables the feature.
Mark
_
Mark Edmunds, P.Eng. | Schneider Electric | Renewable Energies
I have a customer who has two separate buildings, a home and a shop. Each
dwelling has it's own service.
He wants to put in two pv systems, one for each service, but wants all the
PV modules to be on the shop roof.
Why is mind going "clunk" when I try to deside if this is allowed
along my merry way?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] O
g the groundingstem of
multiple seperately derived systems, but could we construe a utility service
to one dwelling as a seperately derived system relative to another dwelling
with it's own service? Where can one find the definition of a "seperately
derived system" in the Code?
ed systems in this case because each building
has it's own service and therefore cannot be considered as a seperately
derived system. So where does the Code speak to this.
My sense is that it is a big no-no, but can exactly explain why.
Anyone else out there agree or disagree?
Mark Frye
I have not yet visited the site to see, but I would guess that they are feed
from the same transformer.
If they were, how would that make it OK?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.
one of the two.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf
Or another way to illustrate this problem:
There is nothing in the Code that would stop me from hauling out the old #6
and bonding my GEC to my next door neighbors GEC, if I wanted to?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<h
it. Otherwise
it's onward and upward.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun.
Folks,
I did send the question to John Wiles and he was gracious enough to reply.
Here is his response:
"Mark:
Better ask the utility involved. Probably depends if they are on a common
transformer or not."
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City,
hwest Technology Development Institute, New Mexico State University
575-646-6105 575-646-3841 (FAX)
http://www.nmsu.edu/~tdi/Photovoltaics/Codes-Stds/Codes-Stds.html
SWTDI/NMSU
3705 Research Drive
Box 30001/MSC 3 SOLAR
Las Cruces, NM 88003-8001"
Mark Frye
Berkeley Solar Electric Systems
Folks,
I have a couple of new SunExtender AGM batteries that I will be using in a
UPS application.
My understanding is that I should cycle them before floating them out for
standby service.
Am I getting this right?
How many cycles - to what DOD?
Mark Frye
Berkeley Solar Electric Systems
303
Generally, in order to develope the full tensil strength of the bolt, it
should be engaged by a minimum of 5 threads.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
..except..there wasn't any rubber there anymore...all rotted out.
Back in the day I went for a custom rolled cone flashings that I could caulk
into the post and slide a rubber counter-flashing over the whole thing.
Overkillperhaps.
Best of Luck.
Mark Frye
Berkeley Solar Electric Sy
of these three is electrically identical and
solidly connected inside the inverter. But, I don't know.
The folks at Enphase tech support will not tell me whether or not this is
true.
Anyone out there have any ideas about this?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada
Any comments good or bad?
Tips?
Best regards,
Mark Dickson,
NABCEP Certified Solar PV Installer T
Oasis Montana Inc.
___
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenches.org
Options & settings:
http:/
nd
upfront.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of
Bob,
I think you are talking about Cougar Paws:
http://www.cougarpaws.com/
I love them and buy a pair for anyone who works for me.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysol
How closely have you looked at this? It looks like the Tigo is already about
1/4 the cost of an Enphase. So how close are you to moving from an optimizer
/ inverter combination to a microinverter?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
, with high
voltage (over 250V) DC wiring, and doubling DC connector count.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
___
List sponsored by Home Power magazine
List Address: RE
total
system yield
.0.0013%.
I am not complaining, just musing over this interesting evolution.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
___
List sponsored by Home Power magazine
Thanks Phil,
I have already swapped the module to confim that the problem follows the
module, not the inverter.
I am currently working within channels with my distributor for warranty
replacement having just requested an RMA.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada
ure is
inherent in microinverters as well.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun
The question is not well addressed without knowing the nominal dc system
voltage.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@li
dics meters.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-Original Message-
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of jay peltz
Sent: Monday, Jun
Was that an M190?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On
ssing the
internal face gasket.
I really haven't looked into it much further but I wonder if the water you
observed entered through an incomplete connector mate, along the conductors,
into the inverter enclosure?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 9
Multiple power stages in the Plus make for a more efficient inverter at
lower solar outputs. Just installed six of the 11.4s and went really
smoothly. Love the modular disconnects which the inverter literally
plugs/drops into.
Best regards,
Mark Dickson,
NABCEP Certified Solar PV
I am out of the office until 07/04/2011.
I am traveling and will have no access to e-mail, please contact Sandra Steffan
(sandra.stef...@schneider-electric.com) for immediate assistance if required.
Note: This is an automated response to your message "Re: [RE-wrenches] Sealed
L-16 size
batter
f not, it is
possible that the coil taps are connected in a manner that is not efficient.
That being said, 15.6 A @ 120V sound like an awefully large number. Perhaps
you have a bad connection at one of your pull boxes.
I would be happy to stop by and take a look at the xfrm spec etc. with you.
customers:
- Buy the refurbished units w/ 1 year warranty
- Buy new replacement units with 10 or 20 year warrranties
- Buy entirely new equipment such as Enphase or SolarEdge
What are other folks experiencing as we move well past the 5 year warranty
horizon for many of our earlier customers?
Mark Frye
"Good" based on their online
configuration tool, and also well in line the the SMA white paper of many
years ago suggesting a 120% mod/inv ratio as optimal.
And yet, the first unit failed in 4 years and the refurb failed in 2 year.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud W
, 75%? Would I have avoided most of my inverter failures
if I had?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mai
Folks,
Has anyone talked with PG&E about needing (or not needing) a new
Interconnection Agreement when changing out inverter make and model without
increasing the size of the PV generator (number of modules) on a system that
is already interconnected?
Mark Frye
Berkeley Solar Electric Sys
be either a diversi9on
load or a contactor that disconnects the grid tied inverters all together.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenche
tting from Lumeta around this?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenche
electrode shall
be permitted to be used for both systems...
Review this article and share it with your inspector in order to determine
what is motivating him.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.
er of the
frame brings it into square and on we go.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wr
breaker in the
existing main panel. Move the existing 30A breaker into the new subpanel and
install the new 15A breaker into the same.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysol
d no additional circuits."
I think this is a much better interpretation and method that preserves a
clean and functional load side connection topology. I think most reasonable
inspectors would agree as well.
Good Luck.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City,
and maybe a special cable from Sharp, as well.
Mark Byington
Cobalt Power Systems, Inc.
ma...@cobaltpower.com
___
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenches.org
Options & settings:
http://lists.re-
How would you integrate a dc generator like to Polar Power into a "standard"
inverter/charge-battery-pv charge controller system?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.b
I see. So there is a big difference between using the DC generator. With an
AC unit I can run it into the inverter/charger and it will give me three
stage charging. With the DC unit, I can really only us it to bulk charge.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City
Can you store the acid dry for ten years?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
___
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenche
eimbursement of
$150.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrench
Rebekah,
If you knew only the power and voltage, then you would use the root of 3 to
determine the amps. But since you know the amps, you don't need to use the
root.
The second equation would be the correct one.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City
Todd,
I thought you were totally off-grid.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
<http://www.berkeleysolar.com/> www.berkeleysolar.com
_
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenche
Allan,
Try www.pvrecycling.com
Haven't used them myself, so can't address cost or other questions.
Mark Byington
Cobalt Power Systems, Inc.
___
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wr
rs?
I am hoping that by taking in the CEC list and perhaps talking with a
different permitting clerk, he will find that the first person was simply
uninformed.
Have any of you run up against this? Was there a way around it?
Best regards,
Mark Dickson,
NABCEP Certified Solar PV Installer T
Looking at the info on-line, it does seem like you are going to need
significantly more foot print for higher capacity systems.
But had to laugh when I saw the note, "Ideal for Eco-Mansions". Hadn't
heard that one before.
On 1/4/2018 10:35 AM, jay wrote:
While we are talking about batteries,
If you can take multiple 1/4" lags, you can consider the Hollaender
Speed Rail square flange. I have used this to built steel pipe rack,
then attaching solar rail to the pipe with u-bolts.
On 3/3/2018 12:45 PM, Ray wrote:
I can see that the TJI manu doesn't want us blowing 3/8" lags through
he DC
disconnect to the exemption from rapid shutdown, right?
Mark Frye
___
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wr
what might need to be "Outside readily accessible". Is
there something other than 690.12 that I need to look at?
Mark
On 4/15/2018 8:26 PM, Darryl Thayer wrote:
I think the code says Outside readily accessible,
On Sun, Apr 15, 2018 at 12:22 PM, Mark Frye <mailto:ma...@berkeleysola
Folks,
I have a 3 foot "walkway" on a roof pitch and between two separate
arrays, as required.
Is there anything that prevents me from running a conduit between the
two arrays, across the "walkway"?
Thanks,
Mark Frye
_
Thanks Brian,
I would read this as saying that I CAN run a conduit across the walkway
since it would be only a "minimal obstruction".
MarK
On 4/19/2018 8:34 AM, Brian Mehalic wrote:
Mark-
The 2018 IFC and IRC both state "Pathways shall be located in areas
with minimal obs
Could have sworn there was a thread here about melted batteries, but it
not showing in my email client anymore.
___
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & settings:
http://
Please let the list know when you get your first request for off-grid
Bitcoin mining. :-)
On 7/24/2018 11:57 AM, Ray wrote:
Oh boy, do I get a bunch of calls for folks wanting to take a 24/7
grow operation off grid. Dana nailed it: Green house. Even with LED
grow lights the numbers are ju
Higher altitude equals lower air density equals lower capacity for heat
transfer to atmosphere equals more heat build up inside equipment.
On 8/20/2018 10:18 AM, ch...@oasismontana.com wrote:
Hi Folks:
What is the deal with altitude restrictions on charge controllers and
other solid state c
Folks,
Has anyone had the chance to work with the Polar Power DC generators
such as https://www.polarpower.com/wp-content/uploads/8220K-972_0115.pdf ?
Anyone aware of good alternatives?
Thanks,
Mark Frye
___
List sponsored by Redwood Alliance
Uh, Looking at what is happening with Tesla's share price, I am not sure
I would want to be "investing" in the products of the neglected solar
division. With Elon alone at the wheel , the Powerwall et. al. might go
the way of the Dodo before too long.
I have been working lately with folks who
Years ago I used something called a RotoPhase Phase Converter to supply
some 3ph equipment on a site that only had 1ph (2ph?). Not efficient.
On 8/6/2019 6:30 PM, Jay wrote:
Hi all
Is there a way to convert a 120/240v generator to a 120/208 3 phase output?
Thx
Jay
___
high load/over load conditions
which are not relevant to the situation we are talking about.
Another way of saying this, which would be more sensible is: yes,
evaluate the circuit in both directions, but only consider the load to
be continuous in the direction from the inverter to the grid.
Mar
Speaking of Tesla...
What with Walmart and (Amazon?) suing them for PV fires...
Can anyone here give a brief run down on the whole Amphenol UTX (?)
defective or cross-mated connector story?
Thanks,
Mark Frye
___
List sponsored by Redwood
future?
This is why I ask about the recyclablility / sustainability of Li
batteries? Some what agnostic here but wondering what the thinking
around this is?
Thanks,
Mark Frye
___
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re
voltage and latch a coil on when it raises
above a set point (250VAC). I then want a timer to release the latch
after about 1 hour.
Sound about right? Are any vendors selling such a device? How about a
parts list from Digikey?
Thanks,
Mark Frye
Folks,
I guess what I am asking is does anyone know of a cheaper way of
implementing than:
Digikey, Relay Monitor Voltage, 646-1145-ND, $117 each, Qty. 1
Digikey, On-Delay Timer, RTE-P1AF20, $49 each, Qty. 1
Digikey, Relay Socket, 27E891, $7 each, Qty. 2
Total = ~ $200
Thanks,
Mark Frye
Glenn,
OK, while I would prefer to not get into compiling code onto an ARM, my
main question would be, how do you get the voltage value into the Arduino?
Rectify the AC voltage and then voltage divide down to the chip input pin?
Mark
On 11/2/2019 10:14 AM, Glenn Burt wrote:
Sounds like a
vercharged, but rather to prevent the AC line from becoming unstable?
I am hoping this is correct and that with $200 of industrial grade
devices from Digikey I can implement a robust control that will
disconnect the GT inverters before the AC line goes so high that the BB
inverter
coming back on line after tipping off.
Mark
On 11/3/2019 9:53 AM, Brian Mehalic wrote:
With frequency-on/off, frequency power control, or other “inverter integrated”
control based on battery voltage/state of charge there is also control in
regards to when the ac coupled inverters come back on
ll, this is why I am asking.
Anyone on the list have more confidence in their understand of BB
inverters in off-grid mode with AC coupled GT inverters?
Mark
On 11/3/2019 10:44 AM, Kienan Maxfield wrote:
Mark,
I think that you're not understanding what Brian is saying. In any
case, yo
ed to endlessly push available
energy into the batteries. You can turn off the switch that connects the
charger to the battery.
Mark
On 11/3/2019 11:13 AM, Kienan Maxfield wrote:
Mark,
Sorry, my post must not have been perfectly clear... I have total
confidence in how the BB inverters work
does this end, when the batteries blow up? Is
that the consequence of not disconnecting the GT?
With many thanks in advance for your help in understanding.
Mark
___
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
sti.net
text 209 813 0060
On Sun, 3 Nov 2019 16:17:39 -0800, Mark Frye
wrote:
Folks,
Please allow me to ask another question:
Suppose I have a bi-direction inverter/charge with no connection to the
grid.
I have GT inverter ac coupled and producing 2000w. The battery is in
float, and I have 200
Happy Hour, yes it is that time here in our home.
Thanks again, but I guess I don't see that there is a catastrophic
result here, the BB raises the frequency and trips the GT. So what, as
long as the BB returns to a standby.
On 11/3/2019 4:31 PM, Mark Frye wrote:
OK, I am hearing this
cture. That most commonly is ensured with an interposing relay
controlled by the BB inverters knowledge of the battery charge, or a
secondary device that performs the measurement.
-Glenn
Sent from my 'smart'phone, so please excuse typos and spelling errors.
-- Original message
have no communication with a Rule 21 GT inverter.
The BB, it will just keep charging and charging with any extra energy coming
from the GT inverter. The BB has no regulation, there is no absorb or float,
just charge.
jay
peltz power
On Nov 3, 2019, at 4:31 PM, Mark Frye wrote:
OK, I am
6:10 AM, Bradley Bassett wrote:
Mark,
The difference is that when AC coupled the power is coming backwards
into the AC out. When it's charging from the grid or generator it is
charging from the AC inputs. The inverter can control the charge from
the inputs but not what is coming in re
Most every industrial grade tracker run off of location and time,
calculates the required array angle. The core code for this is open
source out of NREL (your tax dollars at work). Still over my pay grade
to actually integrate this into a home made tracker.
On 12/2/2019 6:28 AM, Mac Lewis wrot
I received a sales email for some of these recently.
https://www.pv-tech.org/news/panasonic-warns-us-solar-installers-of-tesla-designated-panels-on-the-marke
___
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Cha
I spoke with the vendor who sent me the email and she confirmed that the
modules are not warranted by Panasonic, but rather by Tesla with
slightly different terms, so all is well, buyer beware.
On 1/10/2020 6:46 AM, Mark Frye wrote:
I received a sales email for some of these recently
five minutes.
Voila, I can run house loads from 0 to 2kw with my existing GT PV with
the balance of energy dumped as needed to the immersion heater.
Right?
Mark Frye
___
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re
In the way back machine I remember being at a product roll out meeting
for the brand new Outback FX inverter. I asked the engineer, what was
the smallest battery bank that could be connected to the inverter. He
said on the fly that probably you would want the battery to "weight" at
least as muc
Humm, so maybe a 3kwhr would work for my situation.
On 5/23/2020 10:55 AM, Jerry Shafer wrote:
Mark
The smallest battery I have used is the Blue Planet 8 kWhr. its a half
stack in there cabinet with a 10.8 k PS-3 inverter system with about 6
k on the roof, 8 K is not much but this particular
hanks,
Mark
___
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive:
http://www.mail-archi
et
text 209 813 0060
On Mon, 25 May 2020 14:08:03 -0700, Mark Frye
wrote:
Folks,
Back again into the way back machine, I once installed a system with
multiply FX's stacked in a split-phase configuration. At the advice of
the engineer, I also installed an auto-transformer across the line
mean its
right.
Ray Walters
Remote Solar
303 505-8760
On 5/23/20 5:48 PM, Mick Abraham wrote:
Greetings, All~ Mark Frye had asked:
"...with a
/2020 10:47 AM, la...@starlightsolar.com wrote:
Hi Mark,
One of the many benefits of Li-ion is the ability to provide much
higher continuous current than any comparable size LA battery.
You don’t need more than 2kWh (40Ah) and want to know the smallest
battery you can use. To directly answer
different for a
LiFePo?
I am pretty sure it is much easier to damage a Li with bad charging, but
why?
Thanks,
Mark
___
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & settings:
.5 Hz (in 0.3 volt increments)
This is from my notes from a tech support call, but I am wondering if I
have it mixed up. Protecting at 6 volts above the Absorb seems a bit high.
Thanks,
Mark
___
List sponsored by Redwood Alliance
List Address: R
this feature as a
backup to an AC dump load controller set to maintain Float voltage.
On 6/12/2020 7:12 AM, Jay wrote:
Hi Mark
I found this which might be of help.
https://www.magnum-dimensions.com/sites/default/files/MagArchive/AN-0002-AC-Coupling-Rev-5-10.pdf
Jay
Peltz power.
On Jun 12, 202
Hello,
I have a small array of 8 - SMA SB240 microinverters on the roof. Peak
power out of the array has never exceeded 1800 W.
I am adding a Magnum MS-PAE 4448 with a 315 AH flooded Lead Calcium
battery bank.
Cheers
On 6/12/2020 12:31 PM, Chris Schaefer wrote:
G'Day Mark,
Which
d to an XW+5548. They are very solid performers.
Brad
AEE Solar
On Fri, Jun 12, 2020 at 3:39 PM Mark Frye <mailto:ma...@berkeleysolar.com>> wrote:
Hello,
I have a small array of 8 - SMA SB240 microinverters on the roof.
Peak
power out of the array has never exceede
coupled array feeding the system.
Brad
On Fri, Jun 12, 2020 at 4:34 PM Mark Frye <mailto:ma...@berkeleysolar.com>> wrote:
Yes an elite group within an elite group.
So the SB240 does not have frequency shift /wattage control. How
are you implementing charge control in stand a
On.
On 6/12/2020 7:27 PM, Jay wrote:
Hi Mark
Is this off grid or on?
Jay
On Jun 12, 2020, at 7:09 PM, Mark Frye wrote:
I see.
What you say about the frequency shift being slow makes me again
doubt the value of even using it in my application.
I have a controller that can regulate
Jay,
Do you use an NO or NC solid state relay?
Mark
On 6/13/2020 7:46 AM, Jay wrote:
Hi Mark,
Then the relay method is easy and reliable to use.
Relay trips at whatever battery voltage you don’t want to exceed.
I use a solid state relay with a good heat sink, only switching one leg.
Jay
Built in auto transformer.
On 6/15/2020 8:15 PM, Jim Duncan wrote:
Anyone looking at these, yet? 32 Circuit Breaker Panel with (if looks
like) individual (relay?) control on each circuit and CT Monitoring? I
suppose Arc Fault Trip and GFI are built in?
https://solarbuildermag.com/energy-storage
101 - 200 of 494 matches
Mail list logo