Hi Mark,

The point of operation can be adjusted above normal battery operating 
levels, which essentially disables the feature.

Mark
_____________________________________________________________________________________
 


Mark Edmunds, P.Eng.  |   Schneider Electric   |  Renewable Energies 
Business  |   CANADA  |   Director - Advanced Engineering 
Phone: +1-604-422-2609  |   Fax: +1-604-420-1591  |   Mobile: 
+1-604-613-3285 
Email: mark.edmu...@schneider-electric.com  |   Site: 
www.schneider-electric.com/renewable-energies   |   Address: 8999 Nelson 
Way, Burnaby, BC, V5A 4B5, Canada 

*** Please consider the environment before printing this e-mail 




From:
"Mark Frye" <ma...@berkeleysolar.com>
To:
"'RE-wrenches'" <re-wrenches@lists.re-wrenches.org>
Date:
04/13/2011 01:47 PM
Subject:
Re: [RE-wrenches] AC Coupling Fronius IG Plus 10.0 inverter
Sent by:
re-wrenches-boun...@lists.re-wrenches.org



I see. Can this function be enabled/diabled?
 
Mark Frye 
Berkeley Solar Electric Systems 
303 Redbud Way 
Nevada City,  CA 95959 
(530) 401-8024 
www.berkeleysolar.com  
 

From: re-wrenches-boun...@lists.re-wrenches.org [
mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of 
mark.edmu...@schneider-electric.com
Sent: Wednesday, April 13, 2011 1:15 PM
To: RE-wrenches
Cc: re-wrenches-boun...@lists.re-wrenches.org; 'RE-wrenches'
Subject: Re: [RE-wrenches] AC Coupling Fronius IG Plus 10.0 inverter


Hi Mark, Gary, 

The Xantrex XW series inverters will  do a frequency shift to cause most 
models of grid-tied inverter to disconnect when the batteries are full, 
while the system is operating in an ac coupled off-grid mode. The 
following app-note describes this operation. 

Cheers, 

Mark 

http://www.global-download.schneider-electric.com/852577A4005D7372/all/8FA29D94B918A0FB8525781F0072FCA7/$File/ac-coupling-app-note(976-0240-01-01_rev-a).pdf

_____________________________________________________________________________________
 


Mark Edmunds, P.Eng.  |   Schneider Electric   |  Renewable Energies 
Business  |   CANADA  |   Director - Advanced Engineering 
Phone: +1-604-422-2609  |   Fax: +1-604-420-1591  |   Mobile: 
+1-604-613-3285 
Email: mark.edmu...@schneider-electric.com  |   Site: 
www.schneider-electric.com/renewable-energies   |   Address: 8999 Nelson 
Way, Burnaby, BC, V5A 4B5, Canada 

*** Please consider the environment before printing this e-mail 



From: 
"Mark Frye" <ma...@berkeleysolar.com> 
To: 
<g...@icarussolarservices.com>, "'RE-wrenches'" 
<re-wrenches@lists.re-wrenches.org> 
Date: 
04/12/2011 09:37 PM 
Subject: 
Re: [RE-wrenches] AC Coupling Fronius IG Plus 10.0 inverter 
Sent by: 
re-wrenches-boun...@lists.re-wrenches.org




Gary, 
  
I have been looking at some AC coupled stuff lately. The "FSC" is 
propriatary to SMA, Sunny Island to Sunny Boy.  Pretty much anything else 
you need something to sense the voltage of the battery bank so you can 
open a contactor on the AC line to the Fronius when the battery voltage 
gets too high. Once the voltage drops the contactor can close and bring 
the Fronius back on line and then the 5-minute start up delay before it is 
feeding the line again. 

Mark Frye 
Berkeley Solar Electric Systems 
303 Redbud Way 
Nevada City,  CA 95959 
(530) 401-8024 
www.berkeleysolar.com  
 




_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to