Yeah, my plan was to get it everything ready, and once all the changes are merged in, drop in the new code. If all the changes are merged in by the end of Friday, I should have the packaging ready to go by Monday or Tuesday.

Ok, maybe it makes sense to change this right after the D-4 drop, as core code should be basically frozen at this point.

Dan

-Tyler

--
Mailing list: https://launchpad.net/~netstack
Post to     : netstack@lists.launchpad.net
Unsubscribe : https://launchpad.net/~netstack
More help   : https://help.launchpad.net/ListHelp

Reply via email to