Good morning,

I will ask a different question.  Why are you moving the winches 12-18 inches from factory design?  Assuming to align with a different set of rope clutches or are you adding a canvas structure and need more swing room for the handle?

I will tell you the one thing i miss about my 37+ was having the 4 cabin top winches.  That let me adjust jib/main halyard as needed but also be able to load main sheet on another and have a spare for spinnaker or the like.

So, what i am getting at is have you entertained adding a second set since the cabin top is designed for it and the 33 had a version that incorporated that option?


On Fri, Aug 27, 2021 at 12:00 PM Wade Glew via CnC-List <cnc-list@cnc-list.com> wrote:
Hi all,

On my 33-MK 2, I want to move the coach top winches about 12-18 inches from their current location.   The site I'm moving them to is a designated location by design and the coach top is round and flat in the new location to allow a winch placement.   My question is, can I just fill the old holes with unthickened epoxy or ............  what would be recommended?

thanks for your thoughts


Wade
Oh Boy, 33 MK 2
Thanks to all of the subscribers that contributed to the list to help with the costs involved. If you want to show your support to the list - use PayPal to send contribution -- https://www.paypal.me/stumurray Thanks - Stu
--
Regards,

Bob Tallman
631.387.6748
Thanks to all of the subscribers that contributed to the list to help with the 
costs involved.  If you want to show your support to the list - use PayPal to 
send contribution --   https://www.paypal.me/stumurray  Thanks - Stu

Reply via email to