Daniel Rocha wrote:
The test has already began, if you count inspecting the machine as
part of the test:
http://ecatnews.com/?p=1095
That's good. It should have begun weeks ago, but that's good.
When I predicted that the instrumentation would be inadequate, I meant
that would be the case if Rossi is in charge. If he really does have a
customer who is setting up instrumentation I make no predictions.
However, I think a prudent, professional customer would take a lot
longer than one day set up instrumentation for a 1 MW test.
Instruments adequate to do a test of 1 to 10 kW can be set up in a day
or two if all goes well. Ideally, you should use something like this:
http://lenr-canr.org/acrobat/GrabowskiKrobustperf.pdf
I have no idea how you would go about measuring 1 MW. It seems like a
nightmare assignment to me. I doubt the signal-to-noise ratio would be
as good as you get from a 10 kW measurement.
- Jed