I have no idea who this customer might be. I do not like to guess, speculate
or read the tea leaves when I have no information, but I believe it is
unlikely that a major corporation is involved. I say this for the following
reasons:

Several large corporations and institutions such as Georgia Tech have
contacted me about this test. They say it would be unwise to test such a
large reactor without first doing a series of small-scale tests at lower
power levels. Jumping up to high level without first doing these tests would
be dangerous. They are baffled by this plan. I have echoed their remarks
here. So I do not think they would countenance such a large increase.

I asked Rossi whether he has a permit to do this test. He did not respond. I
do not know whether he has one or not, but it seems unlikely to me. I simply
cannot imagine that any sane government official would issue one. I hate to
speculate about these things but that seems impossible. Large corporations
are sticklers for the rules. They *write* the rules, in cooperation with
government regulators. I doubt they would get involved in a test of a large
nuclear reactor that is probably an egregious criminal violation of health
and safety standards. I do not know about Europe but in the US or Japan this
would cause a major scandal, with people being arrested and perp-walked in
front of reporters. This is not something GE or Mitsubishi would let
themselves get involved in, ever, under any circumstances.

If a subordinate at GE were to suggest getting involved, I suppose
management would demand a copy of the permits and certifications for the
reactor as the first step. They would demand technical documents showing
that the reactor was designed by a professional engineering firm that
specializes in pressure vessels. They would want to see computer simulations
of pressure and heat conditions, and certificates showing that the welding
was done by certified experts. I sure as heck would. Testing a laboratory
scale device is one thing; industrial equipment is quite another. A machine
of this size and power is dangerous, even when it is designed with the best
modern computers and simulations, and when it is fabricated by experts and
then carefully examined by an inspector. A conventional combustion reactor
of this size is dangerous. If a hose connection fails, the hose may fly off
with enough force to crush someone's skull, and the steam may scald them to
death. This is not a damned toy, or something you casually turn on after a
few weeks of partial testing.

The test on October 6 clearly did not involve any professional engineering
or instrumentation such as a corporation would bring. Terry Blanton remarked
that a corporation would use large, professional grade instruments with
recent NIST certification stickers. You can recognize this kind of thing. I
did not see any. They did not even have a computer or flow meters for some
of the critical data. To be blunt, the October 6 test was so half-assed, the
students at my local high school could have done a better job. (Granted
several of those kids got into MIT and Georgia Tech.) I find it hard to
believe that a major corporation would jump into this project and be
prepared for a 1 MW test three weeks after the test that produced somewhere
between six and 10 kW but you can't tell because the instruments were so
bad.

Videos and photographs of the equipment outdoors to not show any sign of
professional instrumentation being deployed around it. Again, I do not think
that a professional organization would jump in and be prepared to do a major
test with the outside equipment in three weeks.

- Jed

Reply via email to