On new construction, we like to run MC cable throughout the building shell, from the PV modules to the inverter. We of course include a properly rated DC disconnect before or just after penetrating the shell and use protection plates when we run through studs. And we probably will need to add labels soon in many jurisdictions. My question is as follows:
What are the implications of using flexible metal conduit and pulling the wires ourselves vs using the pre-wired MC cable? Both jackets are Al. - Peter Peter T. Parrish, California Solar Engineering, Inc. 820 Cynthia Ave., Los Angeles, CA 90065 Ph 323-258-8883, Mobile 323-839-6108, Fax 323-258-8885 CA Lic. 854779, NABCEP Cert. 031806-26 [EMAIL PROTECTED] _______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org