I didn't see either form, but they made the correct length the second
time no charge.

On Sat, Jun 22, 2024 at 5:09 PM Seymour J Metz <[email protected]> wrote:
>
> What was in the proposal and what was in the contract? If they didn't deliver 
> what they signed off on, then you have legal recourse, but if your purchasing 
> people changed it then you're SOL.
>
> That reminds me of the time that we ordered a tie line and purchasing changed 
> it to a leased line because it was less expensive, without concerning 
> themselves over whether it would work. The first I heard about it was when 
> C&P (later part of  Bell Atlantic, then Verizon) asked where to install the 
> 208A. "You mean 208B. No, 208A."
>
> --
> Shmuel (Seymour J.) Metz
> http://mason.gmu.edu/~smetz3
> עַם יִשְׂרָאֵל חַי
> נֵ֣צַח יִשְׂרָאֵ֔ל לֹ֥א יְשַׁקֵּ֖ר
>
> ________________________________________
> From: IBM Mainframe Discussion List <[email protected]> on behalf of 
> Mike Schwab <[email protected]>
> Sent: Saturday, June 22, 2024 3:21 PM
> To: [email protected]
> Subject: Re: GRS in MONOPLEX without physical CTCs ?
>
> My site requested cables for x meters, the company won the bid based
> on x feet, won the bid because it was half the cost..  After
> delivering the x feet cables, they had to make the x meters cable. (1
> inch is defined as 25.4 mm, so 39.37 inches, 3.3 feet, 1.1 yards).
>
> On Sat, Jun 22, 2024 at 11:28 AM Tom Brennan <[email protected]> 
> wrote:
> >
> > And don't do like I did a few years ago :)  A co-worker ordered four
> > 3-meter FICON cables for CTC connections from one card to another on the
> > same machine.  Since I'm American I don't really know how long a meter
> > is so I said "sure".  When I went on site, a couple of cables had to run
> > from one side of the z13s to the other, and they barely made it by going
> > under the frame - but still above the raised floor.  A bit tacky.
> >
> > On 6/21/2024 11:44 PM, Brian Westerman wrote:
> > > Ficon adapters and basic sysplex are far cheaper than MIM.  Also, with 
> > > MIM, PDSe sharing is still not completely correct.  At least not as of 
> > > 2023.
> > >
> > > Brian
> > >
> > > ----------------------------------------------------------------------
> > > For IBM-MAIN subscribe / signoff / archive access instructions,
> > > send email to [email protected] with the message: INFO IBM-MAIN
> > >
> > >
> >
> > ----------------------------------------------------------------------
> > For IBM-MAIN subscribe / signoff / archive access instructions,
> > send email to [email protected] with the message: INFO IBM-MAIN
>
>
>
> --
> Mike A Schwab, Springfield IL USA
> Where do Forest Rangers go to get away from it all?
>
> ----------------------------------------------------------------------
> For IBM-MAIN subscribe / signoff / archive access instructions,
> send email to [email protected] with the message: INFO IBM-MAIN
>
>
> ----------------------------------------------------------------------
> For IBM-MAIN subscribe / signoff / archive access instructions,
> send email to [email protected] with the message: INFO IBM-MAIN



-- 
Mike A Schwab, Springfield IL USA
Where do Forest Rangers go to get away from it all?

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

Reply via email to