Eric, what volume is this? What page of the PG are you looking at? Thanks,
On Sat, Jul 4, 2009 at 9:51 AM, Eric Stanfield <[email protected]>wrote: > Apologies if I am again missing something written in the guide, but I can't > seem to find any indication of what interfaces should be built on the 4 > switches in order to peer them together in as10101. When I load the > configs > into the proctorlabs rack, cat1 has a svi in 150.100.81.0/24 with which it > can later peer with R8 and then a handful of routed interfaces which appear > to be one side of routed links to the other three cats. Cat2 has no l3 > interfaces until the 200.x.x.x loopbacks are created. Cat3 and Cat4 have > no > l3 interfaces at all. > > The PG shows Cat2/3/4 being configured with network commands referencing > the > subnets shown in the bottom right of diagram 1. Is this some unspoken task > of having to finalize the routed link configs on Cat2/3/4 or am I just > missing something obvious. > > Thanks > > -- Bryan Bartik CCIE #23707 (R&S), CCNP Sr. Support Engineer - IPexpert, Inc. URL: http://www.IPexpert.com
