On Tue, 2008-11-11 at 09:14 +0000, Alex Smith wrote:
> On Mon, 2008-11-10 at 17:43 -0800, The PerlNomic Partnership wrote:
> > The PNP withdraws one 5 crop from the PBA for ^8.
> > The PNP withdraws one 5 crop from the PBA for ^9.
> > Using a Addition Mill, the PNP mills 5 + 5 = X.
> > The PNP deposits one X crop into the PBA to gain ^30.
Works, I think.
> > The PNP withdraws one 4 crop from the PBA for ^10.
> > The PNP withdraws one 7 crop from the PBA for ^14.
> > Using a Division Mill, the PNP mills 4 / 7 = X.
> > The PNP deposits one X crop into the PBA to gain ^29.
Also works, I think.
> > The PNP withdraws one 4 crop from the PBA for ^11.
> > The PNP withdraws one 9 crop from the PBA for ^13.
> > Using a Addition Mill, the PNP mills 4 + 9 = 2.
> > The PNP deposits one 2 crop into the PBA to gain ^30.
And this works too, I think.
> I think this all fails because it used an out-of-date PBA report and
> therefore got the rates wrong.
Ignore that, I forgot how the rates worked for a moment... (It's only 8
Crops which had the wrong rate on the PBA report it used, out of the PBA
assets which the PNP messes around with.)
--
ais523