On Mon, 2008-11-10 at 17:43 -0800, The PerlNomic Partnership wrote: > The PNP withdraws one 5 crop from the PBA for ^8. > The PNP withdraws one 5 crop from the PBA for ^9. > Using a Addition Mill, the PNP mills 5 + 5 = X. > The PNP deposits one X crop into the PBA to gain ^30. > The PNP withdraws one 4 crop from the PBA for ^10. > The PNP withdraws one 7 crop from the PBA for ^14. > Using a Division Mill, the PNP mills 4 / 7 = X. > The PNP deposits one X crop into the PBA to gain ^29. > The PNP withdraws one 4 crop from the PBA for ^11. > The PNP withdraws one 9 crop from the PBA for ^13. > Using a Addition Mill, the PNP mills 4 + 9 = 2. > The PNP deposits one 2 crop into the PBA to gain ^30. I think this all fails because it used an out-of-date PBA report and therefore got the rates wrong.
(/me zooms off to look at the code to see if e can prevent that happening again...)