Hi Mark,
The point of operation can be adjusted above normal battery operating
levels, which essentially disables the feature.
Mark
_
Mark Edmunds, P.Eng. | Schneider Electric | Renewable Energies
://www.global-download.schneider-electric.com/852577A4005D7372/all/8FA29D94B918A0FB8525781F0072FCA7/$File/ac-coupling-app-note(976-0240-01-01_rev-a).pdf
_
Mark Edmunds, P.Eng. | Schneider Electric | Renewable
Hi Mark,
We have stock of them here...
Part # 808-0232-01
call, 866-519-1470 to order.
Cheers,
Mark
_
Mark Edmunds, P.Eng. | Schneider Electric | Renewable Energies
Business | CANADA
Mark
_
Mark Edmunds | Schneider Electric | Renewable Energies Business |
CANADA | Senior Director - Advanced Engineering
Phone: +1-604-422-2609 | Fax: +1-604-420-1591 | Mobile:
+1-604-613-3285
Email: mark.edmu...@ca.schn
I am out of the office until 06/04/2010.
I will have limited access to e-mail so please contact Sandra Steffan
(sandra.stef...@ca.schneider-electric.com) for immediate assistance.
Note: This is an automated response to your message "Re: [RE-wrenches] Arc
fault questions."
sent on 6/1/2010 8:5
ers,
Mark
_
Mark Edmunds | Schneider Electric | Renewable Energies Business |
CANADA | Senior Director, Engineering
Phone: +1-604-422-2609 | Mobile: +1-604-613-3285
Email: mark.edmu...@ca.schneider-electric.com | Site: www.xantrex.com |
Address: 8999
_
Mark Edmunds | Schneider Electric | Renewable Energies Business |
CANADA | Senior Director, Engineering
Phone: +1-604-422-2609 | Mobile: +1-604-613-3285
Email: mark.edmu...@ca.schneider-electric.com
we can.
Cheers,
Mark
_
Mark Edmunds | Schneider Electric | Renewable Energies Business |
CANADA | Senior Director, Engineering
Phone: +1-604-422-2609 | Mobile: +1-604-613-3285
Email: mark.edmu
understand what was going on. A learning "opportunity"
for all.
Cheers,
Mark
_
Mark Edmunds | Schneider Electric | Renewable Energies Business |
CANADA | Senior Director, Engineering
Phone:
Hi Jay,
The "official" length limit is 130ft (40m), but we have lots of systems running
at 200ft+ without problem. As long as the inverters and charge controllers are
close together a long run to an SCP or AGS should be fine.
Cheers,
Mark
Mark Edmunds, P.Eng.
Senior Director E
Hi William - the 200A rating is to allow for the fact you may have 48A
of pass through from the grid to the critical loads with the normal 60A
breakers in the system.
Mark
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of William
field - so
we do have a kit with the new front panel we can provide to use with 3
unit systems.
Please contact me off list if you want to set that up.
Cheers,
Mark
Mark Edmunds, P.Eng
Director New Product Development
Xantrex Technology Inc.
mark.edmu...@xantrex.com
From: re
Mark
Mark Edmunds, P.Eng.
Director Engineering
Residential Renewable Energy Markets
Xantrex Technology Inc.
E-mail: mark.edmu...@xantrex.com
Website: www.xantrex.com <http://www.xantrex.com>
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun.
Wrenches - William is correct, the SWI cable is not a straight through
printer style - it must be wired per the drawing on the link below.
Cheers,
Mark
Mark Edmunds
Director Engineering
Residential Renewable Energy Markets
Xantrex Technology Inc.
mark.edmu...@xantrex.com
Hi Darryl,
I think Jon is on the right track here, contact tech support and they
should be able to get this sorted out for you.
Toll-Free Technical Support: 1-800-670-0707 Monday to Friday 5:30am to
5:00pm (PST)
Cheers,
Mark
Mark Edmunds
Director Engineering
Residential Renewable Energy
Hi Drake - the limit in the PV in this case was so we could not exceed
the minimum load in the subdivision, to make sure there was no back feed
to the generator.
Mark
Mark Edmunds, P.Eng.
Director Engineering
Residential Renewable Energy Markets
Xantrex Technology Inc.
E-mail: mark.edmu
-wrenches.org] On Behalf Of Kurt Albershardt
Sent: Friday, March 13, 2009 9:51 AM
To: RE-wrenches
Subject: Re: [RE-wrenches] grid tie sync with big stiff genny?
On 3/13/09 9:34 AM, Mark Edmunds wrote:
We did a test installation in northern British Columbia with 28kW of PV and GT5
inverters selling to
more about it here.
http://nemiahpower.blogspot.com/
Cheers,
Mark
Mark Edmunds, P.Eng.
Director Engineering
Residential Renewable Energy Markets
Xantrex Technology Inc.
E-mail: mark.edmu...@xantrex.com
Website: www.xantrex.com <http://www.xantrex.
Mark Edmunds
Director Engineering
Residential Renewable Energy Markets
Xantrex Technology Inc.
p. 604.422.2609
f. 604.420.1591
E-mail: mark.edmu...@xantrex.com
Website: www.xantrex.com <http://www.xantrex.com>
From: re-wrenches-boun...@lists.re-wrenches.org
[mai
will do our best!
Yours for a windy future...
Mark
Mark Edmunds
Director Engineering
Residential Renewable Energy Markets
Xantrex Technology Inc.
p. 604.422.2609
f. 604.420.1591
E-mail: mark.edmu...@xantrex.com
Website: www.xantrex.com <http://www.xantrex.com>
Fr
Hi William - I will send you the schematic for the cable if you want to
have a go dealing with ribbon cable. There should be some stock of these
at distributors too.
If anyone else is interested in the SWI drawing contact me directly, the
file is too big to post here!
Cheers,
Mark
Mark
to
charge.
Once you have that data a call to the tech support line can get some
more pointers.
Cheers,
Mark
Mark Edmunds
Xantrex Technology Inc.
-Original Message-
From: re-wrenches-boun...@lists.re-wrenches.org
[mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of William
M
ttp://www.abrahamsolar.com/>
Voice: 970-731-4675
-- Original Message ---
From: "Mark Edmunds" <[EMAIL PROTECTED]>
To: "RE-wrenches"
Sent: Wed, 10 Dec 2008 09:07:39 -0800
Subject: Re: [RE-wrenches] XW connection to PC?
> Hi All - yes the XW Gate
e yet, but can be ordered through the tech support group)
The built in com ports on the XW system devices use CAN bus hardware,
with a proprietary communication protocol, so either one of the above
devices is the best way to make your connection from this to a computer.
Cheers,
Mark
problem your site is having.
Best Regards,
Mark
Mark Edmunds
Xantrex Technology Inc.
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Peter
Parrish
Sent: Saturday, December 06, 2008 10:00 AM
To: 'RE-wrenches'
Subject: [RE-wrenches] Has Xantrex Changed Owners
Hi Peter,
Erika is a good person to talk to about XW systems, she is the technical
product manager for the line. I will look into the history on your site
and someone will be in touch to give you a hand.
Regards,
Mark
Mark Edmunds
Xantrex Technology Inc.
From: [EMAIL PROTECTED
absorption level.
The XW should get back in grid-tie sell mode automatically, as long as
the battery voltage was above the Grid Support Volts setting. You may
want to try dropping that.
Hope this helps!
Mark
Mark Edmunds
Xantrex Technology Inc.
A subsidiary of Schneider Electric S.A.
-Original
Mark Edmunds
Xantrex Technology Inc.
(soon to be Schneider Electric!)
-Original Message-
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of William
Miller
Sent: Wednesday, September 24, 2008 9:06 AM
To: RE-wrenches
Subject: [RE-wrenches] SW inverter matching
Friends:
Is it
Hi Matt -
I think I know which site you are referring to, and the issue there was
not an inverter temperature problem. The units were running at or colder
than the rated minimum temperature for GT's... and other than for the
LCD not being very readable this is not a problem. We routinely test
.
Needless to say this has been looked at closely in house and all the
hooks were designed in to add a system A-h meter module...we need to
figure out when and how we can best add this. No definite answer yet,
but all input appreciated.
Cheers,
Mark
Mark Edmunds
Xantrex Technology Inc.