Re: [RE-wrenches] SMA SI/Midnite enclosure

2015-02-13 Thread william
Tom: Look at the panorama at the bottom of this page: http://www.millersolar.com/MillerSolar/Portfolio/Commercial/RM/Equipment_room.html Notice that we need to run battery cables through about 10 feet of gutter to the furthest left Sunny Island. If I had used the Midnite Sunny Isla

Re: [RE-wrenches] Outback AGS & eq

2015-02-13 Thread Matt James
Hi All, I confirmed that a Mate3 with 002.017.000 firmware or later will stop after an EQ cycle if the AGS gen control function is changed from Manual to Auto after the genny is started. It may also work with earlier firmware revs, but I only had a 2.17 rev close by for testing. Matt James Ap

[RE-wrenches] Mounting on Steel and Fabric Buildings

2015-02-13 Thread Rich Nicol
Hello Wrenches I am in the initial planning stage of a 150kw roof mount installation. It’s new construction and the architect for this commercial agricultural building is strongly considering a steel (manufacture is Legacy) and fabric building. Any insights or experiences with steel & fabric b