Tom:
Look at the panorama at the bottom of this page:
http://www.millersolar.com/MillerSolar/Portfolio/Commercial/RM/Equipment_room.html
Notice that we need to run battery cables through about 10 feet of gutter to
the furthest left Sunny Island. If I had used the Midnite Sunny Isla
Hi All,
I confirmed that a Mate3 with 002.017.000 firmware or later will stop after an
EQ cycle if the AGS gen control function is changed from Manual to Auto after
the genny is started.
It may also work with earlier firmware revs, but I only had a 2.17 rev close by
for testing.
Matt James
Ap
Hello Wrenches
I am in the initial planning stage of a 150kw roof mount installation. It’s new
construction and the architect for this commercial agricultural building is
strongly considering a steel (manufacture is Legacy) and fabric building.
Any insights or experiences with steel & fabric b