Just thought I would post my days experience with Xantrex. I had another
GT inverter blow up and i called the new tech support number. 5 minutes
from dialing I have a RMA # and a replacement will go out today. Maybe
Schnieder is helping? Or I just got lucky?
I just had a conversation with a plan checker in LA County yesterday on that
very topic.
When I directed him to NEC 690.14(C)(1) & 690.31(E):
690.14(C)(1) Location.
The photovoltaic disconnecting means shall be installed at a readily accessible
location either on the outside of a building or
Hi Larry,
You've got a few options,
either a few smaller turbines or one large unit;
Derik at Hipower really knows his stuff with the intertie hydros.
For the smaller units (which might be cheaper) contact
Derik at Hipower hydro
707-923-3507
http://hipowerhydro.com/
for the larger unit,
cont
Wrenches,
Any recommendations for a small scale hydro manufacturer for a grid-
tied system with about 80 feet of head and 1200 gallon per minute
flow and the dam already in place. The load at this Center is to
high for an affordable battery bank and the grid is close at hand,
they alread
4 matches
Mail list logo