Peter
I have push tube control for my KR2 from the dual stick assembly all the way to
the elevator horn with a transfer bell crank approximately 12 inches behind the
seat/rear spar. It is also drilled to allow for the same and reduced
deflection with same total movement at the elevator, but mor
quot;Colin Rainey"
To:
Sent: Thursday, September 22, 2005 1:56 PM
Subject: KR> Pushtube control
> Peter
> I have push tube control for my KR2 from the dual stick assembly all the
> way to the elevator horn with a transfer bell crank approximately 12
> inches behind the seat/rea
> [Original Message]
> From: Colin Rainey
> To:
> Date: 9/22/2005 8:56:56 AM
> Subject: KR> Pushtube control
>
> Peter
> I have push tube control for my KR2 from the dual stick assembly all the
way to the elevator horn with a transfer bell crank approximately 12 inches
beh
al Message-
From: Jack Cooper [mailto:kr2coo...@earthlink.net]
Sent: Thursday, September 22, 2005 8:28 AM
To: brokerpilot9...@earthlink.net, KRnet
Subject: RE: KR> Pushtube control
Peter
Here is how I did a control tube elevator.
http://jackandsandycooper.com/stickandpedals.html
(Near
gt; and
> proven by test to be safe.
>
> Jim Mullen
> KR2S Everett Washington
>
>
>
> -Original Message-----
> From: Jack Cooper [mailto:kr2coo...@earthlink.net]
> Sent: Thursday, September 22, 2005 8:28 AM
> To: brokerpilot9...@earthlink.net, KRnet
>
5 matches
Mail list logo