hi Nick;
Yes, there was/is a bug about osx10.9 compiler issues, see bug#936977
for details. However, that bug specifically happens with builds-only,
and is unrelated to this tests-only proposal. I'm not aware of anything
preventing us from running 10.9 *testing*.
Hope that helps.
John.
=
On 1
tl;dr: In order to improve our osx10.6 test capacity and to quickly
start osx10.9 testing, we're planning to make the following changes to
our OSX-build-and-test-infrastructure.
1) convert all 10.7 test machines as 10.6 test machines in order to
increase our 10.6 capacity.
2) convert all 10.8 test
tl:dr: We recently installed system monitoring software on our buildbot
masters, build-not-test slaves, and various other RelEng machines. IT
want to continue this rollout, deploying monitoring software onto RelEng
production test machines, which raises a concern about possible impact
to performanc
hi kats (cross-posting to dev-b2g);
tl:dr; we think all is ok again, details below. To avoid this happening
again this week, we're changing tryserver to reduce the number of
Android-tests-run-on-tegra-by-default. If you specifically want tegra
testing on tryserver, you will need to state that when
(cross-posting to make sure this is not missed; please respond in
dev-planning or bug#847727)
tl,dr: we're moving replication of gecko+gaia repos to more robust
systems. This email gives quick status, and summary of rollout plan.
In the rush to B2G 1.0 release, we had to quickly stand up r
cc-ing dev-builds to see what the BuildConfig folks think.
tc
John.
=
On Wed Aug 14 13:07:14 2013, Adam Roach wrote:
> Over the past few weeks, I've had the build completely break three
> time due to issues with Apple clang 4.1, which tells me that we're not
> doing any regular builds with App
(cross-posting to make sure this isnt missed - please reply in
dev.planning.)
hi;
tl;dr: RelEng has renamed + re-scoped our Bugzilla components, added
some new components, and moved them all to a new top-level “Release
Engineering” product. This should make it easier for people to file bugs
in Re
hi RyanVM;
I really like this proposal because it gives Mozilla a way for
developers to continue doing checkins even during a prolonged
mozilla-inbound closure. The experiment with birch as "b2g-inbound" has
been really successful so far, which is good.
To easily experiment to see if the proposal
hi;
We will have a treeclosing maintenance window Sunday, April 21 from
10:00-14:00PT (17:00-21:00UTC). This is for changes and upgrades to
firewalls in the scl3 colo. More details in tracking bug
https://bugzil.la/862956.
All trees will be closed during this period. Jobs in progress at start
of
hi;
If you are involved in any of the following locales, please read on.
Otherwise, you can hit delete now!
af
ak
as
br
bn-IN
da
eu
gd
gu-IN
hy-AM
is
ka
kk
km
kn
lg
mai
mk
mn
mr
nso
oc
or
rm
si
son
sw
te
ta-LK
zu
In bug#657789, l10n-drivers gave RelEng this list of locales which had
already s
As soon as the last dependency on bug#843383 is closed, we're planning
to power off the tinderbox.m.o server here at Mozilla.
This should be a non-event, as Firefox, Fennec, B2G, Thunderbird,
SeaMonkey, Camino, NSS and l10n are all no longer using tinderbox.
However, if you know of anyone who is s
-BEGIN PGP SIGNED MESSAGE-
Hash: SHA1
hi; (cc-ing jimm)
The one 32bit binary is used by our users on WinXP, Win7x32, Win8x64.
Jimm, you did a bunch of the recent Win8 work, so I guess would have
the best context - any compat concerns?
tc
John.
=
On Wed Feb 27 11:11:52 2013, Alex Keyb
We will have a scheduled maintenance window Saturday morning, Nov 3rd
from 9.30am to 4pm PDT.
Any access to Hg repositories will be completely down while we migrate
data. All trees will be closed during this period and attempts to commit
or update will be denied.
* bug 805851: hg.mozilla.org da
hi;
We need to close the trees for 10hours on Sunday 21oct2012, from 8am-6pm
PDT, in order to do network upgrades in MTV and SCL1 datacenters. This
downtime is to allow for 8 hours of Ops work, followed by 2 hours of
RelEng spinning systems back up. The scl1 core upgrade is needed in
preparat
Hi,
IT is requesting a tree closing downtime from 3:00-6:00pm PT on Sunday,
12th August. This downtime is to improve the links between two colos,
details in:
* Bug 779167 - Swing sjc1-phx1 vpn to scl3-phx1 vpn for backup
* depending on vendor coordination, possibly also: Bug 764610 -
core1.sc
hi;
IT is requesting a tree closing downtime on Sunday 29 July 2012. This
would be a 3 hour tree closure, from noon to 3pm pacific time.
This downtime is to upgrade firewalls and connectivity in 650castro and
upgrade the link between our Phoenix data center and our Bay Area data
centers. Det
16 matches