[debconf-team, please read below about the booth question]
Hi Andre,
sorry for beeing quite late with talks confirmations.
On Mon, Jun 26, 2017 at 10:15:46AM +0200, Roth, Andre wrote:
>
> Dear DebConf17 team,
>
> We are trying to send a group of engineers to the debconf and would
> need to kno
Hello team,
Our call for proposals for invited speakers¹ says "we would like to
start inviting speakers in the middle of September 2016."
¹) http://blog.debconf.org/blog/debconf17/2016-08-22_call_for_speakers.dc
Regarding tonight's dc-team meeting, it would be good to have an
update, and I've
also sprach Margarita Manterola [2015-04-28 12:37
+0200]:
> I was very worried because I was following the total number. Seeing
> that we still have 74 beds available before we reach the 400 limit, I
> think it's possible that we won't reach this.
So maybe we should beat the drum a bit, PR-wise?
Hi,
We discussed this yesterday, I just want to give a quick status update.
Currently, we have a max of 363 people registered on the same day, out
of which a max of 326 request accommodation.
The hostel includes 435 proper beds (plus 12 beds that come out of a
bed). We also have 32 beds reserve
On Fri, Nov 21, 2014 at 10:59 AM, martin f krafft wrote:
> This is already done.
Perfect, thanks!
Richard
___
Debconf-team mailing list
Debconf-team@lists.debconf.org
http://lists.debconf.org/mailman/listinfo/debconf-team
also sprach Richard Hartmann [2014-11-21 08:12
+0100]:
> Can we take up this line of communication again to get the
> political go-ahead from them so we can focus on technical
> adoption?
This is already done.
--
.''`. martin f. krafft @martinkrafft
: :' : DebConf orga team
`. `'`
`-
Dear all,
I remember that communications with university of Heidelberg stalled
as we needed a non-profit status to progress.
Can we take up this line of communication again to get the political
go-ahead from them so we can focus on technical adoption?
I am already pursuing the technical lead, bu
On 12 November 2014 12:23, martin f krafft wrote:
> also sprach Aigars Mahinovs [2014-11-12 10:53 +0100]:
>> > http://scratch.madduck.net/debconf__pub-data__reports__dc14__dc14-report.en.pdf
>>
>> There is only one photo in that PDF, could that be correct? Christoph
>> did mention "pictures" as p
also sprach Aigars Mahinovs [2014-11-12 10:53 +0100]:
> > http://scratch.madduck.net/debconf__pub-data__reports__dc14__dc14-report.en.pdf
>
> There is only one photo in that PDF, could that be correct? Christoph
> did mention "pictures" as plural.
Reload. My bad. I compiled from a very old sourc
On 12 November 2014 11:48, martin f krafft wrote:
> also sprach Christoph Ulrich Scholler
> [2014-11-12 00:28 +0100]:
>> The layout of the DC14 Final Report is ready, the pictures are
>> added: We have a release candidate.
>>
>> Please have a look at the report and let me know if there is
>> any
also sprach Christoph Ulrich Scholler
[2014-11-12 00:28 +0100]:
> The layout of the DC14 Final Report is ready, the pictures are
> added: We have a release candidate.
>
> Please have a look at the report and let me know if there is
> anything that absolutely needs to be fixed. Otherwise the fina
Hi,
The layout of the DC14 Final Report is ready, the pictures are added: We
have a release candidate.
Please have a look at the report and let me know if there is anything
that absolutely needs to be fixed. Otherwise the final version can be
compiled tomorrow evening (CET).
Cheers
Uli
___
Hi all,
I cannot attend today meeting so I am just share the last information
with you.
Sponsorsing
We have reached CHF 158k, i need to check with hug last payments and generate
an invoice.
There is a sponsorship team meeting on Wednesday 2130 CEST. Please reply to this
email if you plan to atten
On Fri, Jun 29, 2012 at 5:15 PM, Leandro Gómez wrote:
> The original plan was to accommodate people (80 in total) coming on the
> 7th or after in Brandts Hotel near UCA.
>
> Today we went with Norman to sign contract with the hotel and they told us
> they'll be very glad to have us, but in two di
On Jun 29, 2012 7:48 PM, "Holger Levsen" wrote:
>
> Querido Don Leito,
>
> muchas gracias for the hotel status update!
>
> On Freitag, 29. Juni 2012, Leandro Gómez wrote:
> > The difference in costs is ~USD2400 more for switching to Seminole.
>
> I think this is annoying but bearable.
agreed. se
Querido Don Leito,
muchas gracias for the hotel status update!
On Freitag, 29. Juni 2012, Leandro Gómez wrote:
> The difference in costs is ~USD2400 more for switching to Seminole.
I think this is annoying but bearable.
Thank you and everybody involved for resolving this!
cheers con un beso,
The original plan was to accommodate people (80 in total) coming on the 7th
or after in Brandts Hotel near UCA.
Today we went with Norman to sign contract with the hotel and they told us
they'll be very glad to have us, but in two different hotels Brandts1 (near
UCA) and Brandts2 (~1km away). In B
ToDo / status at dc11
[DebConf11/FinalReport]
daytrip
comittee to solve this: andrew, adnan, micah, zlatan
we're getting going
needs to be announced
conference dinner
velimir (aroundthfur) will come up with a plan and present it
tomorrow ;)
bigger sc
Hi,
we asked a while ago to have 1000m network cable and RJ45 connectors to be
bought. Can you give me the status on that?
Cheers,
Martin
--
Martin Zobel-Helas | Debian System Administrator
Debian & GNU/Linux Developer | Debian Listmaster
GPG key http://go.debian.net/B
On Wed, May 05, 2010 at 01:34:07PM -0400, Pablo Duboue wrote:
> > 2) Explore sponsorship/subsidy options
>
> We're currently exploring two local sponsorship leads. Any feelings
> about having the day trip branded? (We can discuss off-list or on IRC
> although I'm not logged in today)
While I am a
On Wed, May 5, 2010 at 10:58 AM, Clint Adams wrote:
> On Wed, May 05, 2010 at 10:40:11AM -0400, Jimmy Kaplowitz wrote:
>> Within the last few days, Michael called the Cyclones and reserved 200 box
>> seats.
>
> Final payment is due July 15, and I assume this means final count as well.
>
> So presu
On Wed, May 05, 2010 at 10:40:11AM -0400, Jimmy Kaplowitz wrote:
> Within the last few days, Michael called the Cyclones and reserved 200 box
> seats.
Final payment is due July 15, and I assume this means final count as well.
So presumably we need to
1) Determine final count
2) Explore sponsorsh
Hi Micah,
On Wed, May 05, 2010 at 10:27:59AM -0400, micah wrote:
>
> At the last global team meeting, there was approval for the expenditure
> necessary to make ticket reservations for the daytrip[0]. It was my
> understanding that either Hydroxide or schultmc would follow through on
> making thi
At the last global team meeting, there was approval for the expenditure
necessary to make ticket reservations for the daytrip[0]. It was my
understanding that either Hydroxide or schultmc would follow through on
making this happen.
I know that we were told some months ago that time was a serious
-BEGIN PGP SIGNED MESSAGE-
Hash: SHA256
Hello,
As we all want to make our meetings more effective, here's a status
report for Quito's bid for DebConf 11. We spent 10 days 'hitting street'
and we have good news around.
Several people have already joined the local team. Last week we invest
On Tue, Apr 29, 2008 at 05:39:57PM +0200, Sven Mueller wrote:
> Hi.
>
> I'm wondering why I didn't get a reply on my last mail. Perhaps the
> wording was a bit vague.
>
> I would like to know what the current status is on travel sponsoring.
> Are people already getting confirmations that their tr
Hi.
I'm wondering why I didn't get a reply on my last mail. Perhaps the
wording was a bit vague.
I would like to know what the current status is on travel sponsoring.
Are people already getting confirmations that their travel will be
sponsored?
I would also like to know wether any help from remo
Hi!
Since I called for the meeting, I realized that it would be nice to
give you a status update on how things are looking for DebConf8.
Venue
-
For a while we entertained the possibility of finding a suitable venue
in Buenos Aires. But it's already obvious that we won't get what we
want in
On Tue, Jun 12, 2007 at 08:42:07PM +0100, Kevin Campbell wrote:
>On Tue, Jun 12, 2007 at 08:40:52PM +0100, Mark Brown wrote:
>> On Tue, Jun 12, 2007 at 08:15:32PM +0100, Mark Brown wrote:
>>
>> > - Teviot are going to give students and parents a tour up to Costa on
>> >Friday. We need to ens
On Tue, Jun 12, 2007 at 08:15:32PM +0100, Steve McIntyre wrote:
> - Wouter was thanked for his musical contribution.
*g* you're welcome :-)
--
Home is where you have to wash the dishes.
-- #debian-devel, Freenode, 2004-09-22
___
Debconf-team mailin
On Tue, Jun 12, 2007 at 08:40:52PM +0100, Mark Brown wrote:
> On Tue, Jun 12, 2007 at 08:15:32PM +0100, Mark Brown wrote:
>
> > - Teviot are going to give students and parents a tour up to Costa on
> >Friday. We need to ensure that people have their badges but other
> >than that not much
On Tue, Jun 12, 2007 at 08:15:32PM +0100, Mark Brown wrote:
> - Teviot are going to give students and parents a tour up to Costa on
>Friday. We need to ensure that people have their badges but other
>than that not much doing.
We were pretty sure that that should actually read Wednesday,
(minutes from Broonie)
Admin:
- Wouter was thanked for his musical contribution.
- Meetings should start on time, not wait for people in future.
Registration:
- We have badge stuff. We should be able to hand badges out tomorrow - no
sign of bags so we won't wait for them.
- Food ticke
Hi,
Everything still seems to be going well in general, with no major
problems. (Power and wireless are still good, which is all most people
care about anyway) Otavio appears to have got his luggage in the
end, since he was around Teviot in his normal wheelchair today.
Here are some quick
On 11047 March 1977, Moray Allan wrote:
> Network: The network creation progressed further today. There is now
> networking to the BOF rooms, and to what will become the primary hacklab
> space during the DebConf week, using a couple of network cables threaded
> between nearby windows to bridge c
Network: The network creation progressed further today. There is now
networking to the BOF rooms, and to what will become the primary hacklab
space during the DebConf week, using a couple of network cables threaded
between nearby windows to bridge corridor spaces/floor changes. The
wireless netwo
36 matches