Bacula doesn't appear to have a "last of the month" option. Is
there a way to schedule jobs to occur on say the last Saturday of each month?
TIA
Conrad Lawes | Systems Administrator | cla...@navtech.aero |
--
Live
Hi,
25.01.2008 16:26, Bill Szkotnicki wrote:
> I have many jobs scheduled for the same time
> and
> Maximum Concurrent Jobs = 1
>
> They run in sequence but if the current job is waiting for the FD to
> connect nothing happens I think.
> Is there a way to have that job put at the bottom of the
I have many jobs scheduled for the same time
and
Maximum Concurrent Jobs = 1
They run in sequence but if the current job is waiting for the FD to
connect nothing happens I think.
Is there a way to have that job put at the bottom of the list of
scheduled jobs so that the director can deal with