I have many jobs scheduled for the same time
and
  Maximum Concurrent Jobs = 1

They run in sequence but if the current job is waiting for the FD to 
connect nothing happens I think.
Is there a way to have that job put at the bottom of the list of 
scheduled jobs so that the director can deal with those FD's that are 
present?



-------------------------------------------------------------------------