Hello All OutBack does offer a RSD solutions. Please see the links below http://www.outbackpower.com/products/safety-compliance/rapid-shutdown-kits We also pair up with the FireRaptor RSD product http://www.outbackpower.com/products/safety-compliance/fireraptor-rapid-shutdown
In addition the FM100 has onboard AFCI http://www.outbackpower.com/products/charge-controllers/flexmax-100-afci I hope this helps. Take Care All From: RE-wrenches <re-wrenches-boun...@lists.re-wrenches.org> On Behalf Of Jerry Shafer Sent: Wednesday, April 29, 2020 11:34 PM To: RE-wrenches <re-wrenches@lists.re-wrenches.org> Subject: Re: [RE-wrenches] Rapid Shutdown Compliance Wrenches We are taking two very different issues and mixing them together. RSD and Arc-fault are different, arc fault will and does prevent fires, RSD was brought out of the need to vent a roof that even with the meter pulled have 500 volts and resulted shocks to fire fighters by cutting into roofs or nearby conduite. This is fact not conjecture. Arc fault is a fire preventer but requires nothing on the roof when using string level inverters. Now both RSD and arc-fault in off grid increase the complexity but the new charge controllers fit the arc and Tigo fixes the RSD issues. I know everyone of you learned to use a smart phone and can now adapt again to this new tech, we have to be leaders in this industry and not well you know. Jerry NABCEP PV Inspector. Been in this industry since 1978 On Wed, Apr 29, 2020, 6:57 PM Jay <jay.pe...@gmail.com<mailto:jay.pe...@gmail.com>> wrote: Hi Drake I will disagree, there have been many roof top fires. But regardless we have to do these new regulations and I for one welcome the safety. The main issue is accessing the faulty/suspect component under the module possibly requiring removing multiple modules, a slow and expensive process. My technique is to install the MLPE at the edges of the array, using wire extensions. That way at most I have to remove a single module. And Im working on a drop bracket which would allow better cooling and easier access without module removal to the MLPE, greatly reducing time to swap. Jay Peltz Power. On Apr 29, 2020, at 7:59 AM, drake.chamber...@redwoodalliance.org<mailto:drake.chamber...@redwoodalliance.org> wrote: Clearly, rapid shutdown increases cost and reduces reliability. Given the excellent safety record of PV, prior to rapid shutdown being required, it is unnecessary. The few anecdotal incidents of PV fires were not enough to justify the requirement, especially on smaller systems. According to a friend who worked for a local installation company that went under, a big part of the reason for their failure was the chronic replacement of microinverters and optimizers. What steps can be taken to create some balance in the rapid shutdown requirements that are in the NEC? --- On 2020-04-29 07:27, Sky Sims wrote: So far rapid shutdown has been a nightmare. It's added a lot of cost for no measurable benefit. Using always off devices like midnight solar and Tigo makes it impossible to test open circuit voltages. Which opens the door to tons of problems when commissioning systems. Also we've been trying out midnight Solar's product and have had an absurd failure rate. Which means lots of truck rolls and troubleshooting and system downtime. They send replacement product but they aren't paying for the lost weeks of productivity. We have Tigo product in hand and are deciding which project to try it on. But our big concern about using it is not only the inability to confirm open circuit voltage of the strings but also the way panels bypass if the device doesn't allow the panel to connect properly. Both of these features are a recipe for problems and potential troubleshooting nightmares. The warranty from Tigo doesn't cover our expense if the product fails. And that's really what our reservations about the product boil down to right now. If we're on a job with 50 units and one fails, the contractor or the homeowner will be the ones eating the expense of finding it and replacing it. There has to be a better option. Sky Sims Https://EcologicalSystems.biz On Apr 28, 2020, at 7:46 PM, Corey Shalanski <coreso...@gmail.com<mailto:coreso...@gmail.com>> wrote: Now that 690.12 of the NEC 2017 has been in effect for several years, I am curious how designers and installers are meeting the associated requirements with string inverter-based systems (*not* considering microinverters or DC optimizers). I am generally a fan of the KISS principle, and as best I can determine the Tigo TS4-F device is one of the simplest options currently available on the market. What are others finding? I'd love to hear about favored options for complying with rapid shutdown. Any success stories? or better yet, any early failures? -- Corey Shalanski Jah Light Solar Portland, Jamaica _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org<mailto:RE-wrenches@lists.re-wrenches.org> Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm<http://www.re-wrenches.org/etiquette.htm> Check out or update participant bios: www.members.re-wrenches.org<http://www.members.re-wrenches.org> _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org<mailto:RE-wrenches@lists.re-wrenches.org> Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm<http://www.re-wrenches.org/etiquette.htm> Check out or update participant bios: www.members.re-wrenches.org<http://www.members.re-wrenches.org> _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org<mailto:RE-wrenches@lists.re-wrenches.org> Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm<http://www.re-wrenches.org/etiquette.htm> Check out or update participant bios: www.members.re-wrenches.org<http://www.members.re-wrenches.org> _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org<mailto:RE-wrenches@lists.re-wrenches.org> Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm<http://www.re-wrenches.org/etiquette.htm> Check out or update participant bios: www.members.re-wrenches.org<http://www.members.re-wrenches.org>
_______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org