Hey Matt,
See Morningstar's
TS-MPPT-60-600V-48-DB-TR
https://www.morningstarcorp.com/products/tristar-mppt-600v/
Hope that helps!
Jeff
~~~~~~~~~~~
Jeff Clearwater
Village Power Design
linkedin <https://www.linkedin.com/in/jeff-clearwater-0622a312/>
www.villagepowerdesign.com <http://www.villagepowerdesign.com>
cell - 413-559-9763
~~~~~~~~~~~~~~~~~~~~~~~
Matt Sherald wrote on 10/22/19 9:07 AM:
Hi All,
I've been asked to review a GT-BBUS that was installed with a DC to AC
ratio of 2.14. The system owner is frustrated b/c his 9.2-kW of PV is
bottlenecked by an 80A MPPT (~4,300W). The inverter is a XW-5548 so
there is a second bottleneck to overcome even if an additional CC were
added.
My inclination is to install a GT inverter for half the array and make
a separate point of connection. I have considered adding a transfer
switch on the PV conductors to allow the owner to toggle between this
new GT inverter and the existing CC. I thought that having the option
would be of benefit during extended outages with little sun.
I'd be curious to know if anyone has had to solve a problem similar to
this one and if they were able to find a suitable switch. To-date, I
have not located a good transfer switch or breaker assembly with
handle-tie etc... Any thoughts are greatly appreciated.
--
Matt Sherald
PIMBY Energy, LLC
NABCEP Certified Solar PV Installer®
304-704-5943
www.getpimby.blogspot.com <http://www.getpimby.blogspot.com>
www.getpimby.com <http://www.getpimby.com>
_______________________________________________
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive:
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out or update participant bios:
www.members.re-wrenches.org
--
~~~~~~~~~~~
Jeff Clearwater
Village Power Design
linkedin <https://www.linkedin.com/in/jeff-clearwater-0622a312/>
www.villagepowerdesign.com <http://www.villagepowerdesign.com>
cell - 413-559-9763
~~~~~~~~~~~~~~~~~~~~~~~
_______________________________________________
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive:
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out or update participant bios:
www.members.re-wrenches.org