The customer needs education! The SQ should be powered from 240vac and the CU can run a generator input if needed. AC power should be designed so that it never goes away offgrid in my opinion. There should be a water tank that can give time to make repairs.
Dave Angelini Offgrid Solar "we go where powerlines don't" http://members.sti.net/offgridsolar/ [1] e-mail offgridso...@sti.net [2] text 209 813 0060 Links: ------ [1] http://members.sti.net/offgridsolar/ [2] mailto:offgridso...@sti.net
_______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org