I have a client that asked me if i can install a battery free grid tied
system and have a dump load activate when it is overproducing.  I am at a
loss, here.  Anyone have ideas?  A CT on the line side that would activate
a relay while current is flowing to the utility?

Thanks,
Kris

-- 