Adam, We have never pinned the pipe directly. But we have pinned into ledge with a short but wide sono tube. Cold Rolled steel rods through the 3" pipes to lock into the pour. In this case we let pipe condensate drain into small sand bed under the concrete pour. Extremely solid install in windy location on ledge.
Doug Wells The Solar Specialists Morrisville, VT 05661 (p) 802-223-7014 (c) 802-498-5856 www.thesolarspecialists.com _______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org