Dana, Maybe wire 3 in series to a single Enphase? It'll depend on what the voltages are.
> Date: Tue, 4 Jun 2013 14:01:42 -0600 > From: "Dana" <d...@solarwork.com> > To: "'RE-wrenches'" <re-wrenches@lists.re-wrenches.org> > Subject: [RE-wrenches] Old Modules for GIT system? > Message-ID: <05f401ce615e$55773960$0065ac20$@com> > Content-Type: text/plain; charset="us-ascii" > > I have a client eat has a 24 - Solarex SX 80 PV module system that was off > grid, Trace inverter, APT Power panel and an very aged L-16 battery bank. > > The utility came in and he wants to go grid tie. It is or was only 960 watt > originally. I realize that an array rewire is in order and it may only be a > 1 KW system but he is interested in getting the equipment upgraded. > > Has anyone done a grid tie with such a small array and with modules this > old? > > Any thoughts on installing sealed batteries and leaving it alone? > > > > > >
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Change email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org