Wrencher's, I am having a good debate with a fellow solar installer regarding an NEC requirement to isolate a meter between two disconnecting means adjacent to the meter when grid connecting via a tap. My thought is that if we have a load center with breakers to combine multiple inverters on the roof, the PV meter can be located in the basement between the roof load center and a fused disconnect adjacent to the tap with no need for a disconnect next to the meter on the load center side of the meter. Can anyone reference a section in the code that requires a disconnecting means adjacent to both sides of the meter? The meter I am referencing simply records the total kWh's of the solar system as required by the State incentive program.
All feedback is appreciated. Al Frishman AeonSolar (917) 699-6641 - cell (888) 460-2867 www.aeonsolar.com
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org