Re: [RE-wrenches] AGM battery charging, more detailsHugh,

The Blue Sky Energy 2512iX, IPN Pro, temp sens. and shunt is about $420 online. 
This combination provides the very best in fully programmable battery charge 
control for systems under 40 amps. There is no equal for the IPN Pro battery 
monitoring that I can find. I have tried them all and put the BSE in the top of 
the class. We have sold over 1000 Blue Sky controllers and will continue 
selling until something better is available. 

If you are looking for a lower cost solution, make sure you use a 3 stage 
controller with temp compensation. We sell the Samlex America SCC-30AB (about 
$200) as a low cost 3-stage charge alternative to the Blue Sky product.

Will your diversion load control charge in multiple stages? Holding high 
voltage on an VRLA battery will shorten the life or may cause thermal runaway. 
You must, according to every manufacturer, reduce the voltage once the battery 
is full. "Who actually follows these guidelines?" I hope everyone as the 
customer is paying you to do it right. Sure, an AGM can survive alternative 
charge methods but after recycling more than 70 tons of batteries at our little 
store, I am a believer in proper battery charging and maintenance.

Larry
  ----- Original Message ----- 
  From: Hugh 
  To: RE-wrenches 
  Sent: Monday, April 25, 2011 11:06 PM
  Subject: Re: [RE-wrenches] AGM battery charging, more details


  .........My questions to the Wrenches List is: "What hardware do wrenches use 
to regulate the charge on an AGM battery?"  Does everyone use this Blue Sky 
Energy device?  Is it possible to use AGM batteries with a conventional 
diversion controller such as the Morningstar Tristar, and if so how do you 
determine the transition from 2.45 V/cell to 2.3 V/cell?  Morningstar offer a 
timed transition, but without knowledge of current or of SOC this is rather 
less precise.


  Both of the charging methods in the agm-faqs linked below (and in the 
Fullriver document) require measurement of the charging current to determine 
the correct transition from one stage to the next.  Measurement of dV/dt is 
also suggested in the case of constant current charging.  Who actually follows 
these guidelines, and can AGM batteries operate successfully without?


  thanks!


  Hugh



_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to