Hi Wrenches, How does one determine how much imbalance can be tolerated on a 3 phase system?
I'd like to feed 2 SMA SB5000s at 277 VAC into a 480 VAC panel instead of 1 13 KW Solectria at 480VAC as the PV system is only 9500 Watts STC. The main on the backfed service panel is 600 A. But I'm not that sure of the loads as it's new construction and hasn't been characterized.
What are the appropriate calcs to do here? Thanks! Jeff C. -- ~~~~~~~~~~~~~ Jeff Clearwater Village Power Design Sustainable Energy & Water Solutions for Home & Village http://www.villagepower.com [EMAIL PROTECTED] NABCEP (tm) Certified Solar PV Installer Voice: 413-259-3776 Fax: 413-825-0703 65 Schoolhouse Rd Amherst, MA 01002 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~`~ _______________________________________________ List sponsored by Home Power magazine RE-wrenches@lists.re-wrenches.org http://lists.re-wrenches.org/listinfo.cgi/re-wrenches-re-wrenches.org List rules & etiquette: http://www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org