Ag Hatzim wrote these words on 04/09/06 17:56 CST: > I would like to say,with all the respect ... "Freeze the damn thing and both > teams > be ready for a release" :)
Probably working a testing branch for a few weeks, then a beta-1 release, perhaps a beta-2 being required after that, then a release if all goes well has been sort of the cycle the last couple of times. That puts a release still a ways off. And BLFS always take a bit of time to review after LFS has finally settled on versions that stick. Meaning that BLFS is a month or more behind LFS, usually. -- Randy rmlscsi: [bogomips 1003.28] [GNU ld version 2.16.1] [gcc (GCC) 4.0.3] [GNU C Library stable release version 2.3.6] [Linux 2.6.14.3 i686] 18:03:00 up 15 days, 5:40, 1 user, load average: 1.68, 0.95, 0.41 -- http://linuxfromscratch.org/mailman/listinfo/lfs-dev FAQ: http://www.linuxfromscratch.org/faq/ Unsubscribe: See the above information page