Ag Hatzim wrote these words on 04/09/06 17:56 CST:

> I would like to say,with all the respect ... "Freeze the damn thing and both 
> teams
> be ready for a release" :)

Probably working a testing branch for a few weeks, then a beta-1
release, perhaps a beta-2 being required after that, then a release
if all goes well has been sort of the cycle the last couple of times.

That puts a release still a ways off. And BLFS always take a bit of
time to review after LFS has finally settled on versions that stick.
Meaning that BLFS is a month or more behind LFS, usually.

-- 
Randy

rmlscsi: [bogomips 1003.28] [GNU ld version 2.16.1] [gcc (GCC) 4.0.3]
[GNU C Library stable release version 2.3.6] [Linux 2.6.14.3 i686]
18:03:00 up 15 days, 5:40, 1 user, load average: 1.68, 0.95, 0.41
-- 
http://linuxfromscratch.org/mailman/listinfo/lfs-dev
FAQ: http://www.linuxfromscratch.org/faq/
Unsubscribe: See the above information page

Reply via email to