Peter Van Lone wrote:
> On 2/16/07, Per Nystrom <[EMAIL PROTECTED]> wrote:
>   
>> There are a lot of variables not accounted for here, but the dropoff in
>> closure rate after 2.6.0 is still pretty dramatic.
>>     
>
> I find that pretty amazing. The connector project has the "feel" of
> not being high priority, and this just validates it.
>
> Damn ... damn ...
>
> <sigh>
>
> I'm not a coder at all, but if there were any signs of life in this
> project, and help were needed, I could do testing and doc writing ...
>
> Peter
> _______________________________________________
> Evolution-list mailing list
> Evolution-list@gnome.org
> http://mail.gnome.org/mailman/listinfo/evolution-list
>   
I can vouch that bugs I posted against 2.9 are being actively worked upon.
_______________________________________________
Evolution-list mailing list
Evolution-list@gnome.org
http://mail.gnome.org/mailman/listinfo/evolution-list

Reply via email to