On 2/16/07, Per Nystrom <[EMAIL PROTECTED]> wrote: > > There are a lot of variables not accounted for here, but the dropoff in > closure rate after 2.6.0 is still pretty dramatic.
I find that pretty amazing. The connector project has the "feel" of not being high priority, and this just validates it. Damn ... damn ... <sigh> I'm not a coder at all, but if there were any signs of life in this project, and help were needed, I could do testing and doc writing ... Peter _______________________________________________ Evolution-list mailing list Evolution-list@gnome.org http://mail.gnome.org/mailman/listinfo/evolution-list