Hi all, Since Flink 1.14 is already code freeze, but for FLIP-147 we still have the last piece of work left, thus we would like to start a discussion about merging them after code freeze.
Currently there are two non-bug-fix issues left and since 1. FLINK-23512: The PR is in fact approved before code freeze, but we failed to get a green CI test before code freeze; and it mainly added a check to illegal job graph modification with finished state, which should only have a limit affection. 2. FLINK-21090: The PR complements the ITCase for the final checkpoint functionality, currently it is blocked by several on-going small bug fixes. This should not affect the normal processes. Thus if no objections we would tend to merge them to complete FLIP-147. Very thanks everyone! Best, Yun