Hi all,

Since Flink 1.14 is already code freeze, but for FLIP-147 we still have the 
last piece of work left,
thus we would like to start a discussion about merging them after code freeze. 

Currently there are two non-bug-fix issues left and since
1. FLINK-23512: The PR is in fact approved before code freeze, but we failed to 
get a green CI test
before code freeze; and it mainly added a check to illegal job graph 
modification with finished state, 
which should only have a limit affection.
2. FLINK-21090: The PR complements the ITCase for the final checkpoint 
functionality, currently it is 
blocked by several on-going small bug fixes. This should not affect the normal 
processes.

Thus if no objections we would tend to merge them to complete FLIP-147. 

Very thanks everyone!

Best,
Yun

Reply via email to