Dan Kegel wrote:
> On Sat, Mar 15, 2008 at 11:04 AM, Alexandre Julliard
> <[EMAIL PROTECTED]> wrote:
>   
>>  > http://wiki.winehq.org/WineReleasePlan
>>
>>  We need a code freeze and stabilization period before the release. My
>>  thinking is that we should have a 1.0rc1 release, probably sometime in
>>  May, and from that point on only accept small obvious fixes. Then we'd
>>  have rc2, rc3, etc. as needed until the bug list gets small enough. And
>>  by rc1 (or even earlier) any bug that requires more than a small simple
>>  patch would be deferred to 1.1.0.
>>     
>
> How's it look now?
> - Dan
>
>
>   
Dan:

How much of a pain would it be to switch to weekly releases during the 
rc period to catch patches and regresssions?

James