On Sat, Mar 15, 2008 at 11:04 AM, Alexandre Julliard <[EMAIL PROTECTED]> wrote: > > http://wiki.winehq.org/WineReleasePlan > > We need a code freeze and stabilization period before the release. My > thinking is that we should have a 1.0rc1 release, probably sometime in > May, and from that point on only accept small obvious fixes. Then we'd > have rc2, rc3, etc. as needed until the bug list gets small enough. And > by rc1 (or even earlier) any bug that requires more than a small simple > patch would be deferred to 1.1.0.
How's it look now? - Dan
