Whenever I have something in front of me, from the ones ultimately responsible, 
I dare not venture past that due to it then becoming my (your) problem.

I understand the concern, but we do not want to expose our neck either by 
superseding what could be deemed the criteria from  the AHJ..

R/
Matt

Please rate our customer 
service<https://survey.medallia.com/?emailsignature&fc=3539&bg=Fire%20and%20Fabrication>

Matthew J. Willis, CWBSP, CET
Engineering Manager - Southwest Region
FERGUSON FIRE DESIGN, LLC
A Wholly Owned Subsidiary of Ferguson Fire & Fabrication, LLC
3508 Hwy. 557
West Monroe, LA. 71292
C: 307-236-8249
[email protected]<mailto:[email protected]>
www.FergusonFire.com<http://www.fergusonfire.com/>


From: Taylor Schumacher <[email protected]>
Sent: Thursday, October 5, 2023 12:48 PM
To: '[email protected]' 
<[email protected]>
Subject: [Sprinklerforum] Paint Line-Furnaces

I have a paint line for simple metal trailers and components. I know how to do 
the non-automated powder booths easy enough. What I am struggling with is other 
"booths" on the line. Blast furnaces, in particular, for drying post wash and 
for curing the powder coated parts. They are approximately 1,000 sq. ft. 
rectangles and 20 foot tall. These furnaces regularly get to 650 °F. I don't 
need protection inside per NFPA 86 and the IFC requirements.

When my brain switches back to 13 requirements, I have a large obstructed area 
shielding concrete and transitory metal frames. Insurance is recommending OH2 
overhead for this area. Do I need to increase my overhead requirements to EH2 
for shielded fires even though they're not "combustible" shielded fires?

Any thoughts would be appreciated.


Taylor Schumacher

_________________________________________________________
SprinklerForum mailing list:
https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org
To unsubscribe send an email to [email protected]

Reply via email to