Since it's Festivus season, I thought I'd share this with the group.   Our firm 
is scaled and resourced as a consulting engineering business model and not a 
"free-lance" drafting/design service.   As such, we have direct and overhead 
costs that push our fees to the limits of what contractors typically budget for 
design, so the majority of our work is for architects and developers.  But 
there's a market for what we're doing and I know that our fees are fair for the 
service we provide.   Still, we have tried to sharpen the pencil the past 
couple years because we've partnered with contractors on a few design/build 
projects and I know that there's huge opportunity for us as 3rd party designers 
working under the FP sub.   So I was intrigued by a proposal request that we 
got last week for a mixed use podium project in Los Angeles where the 
contractor reached out and dangled this and another project, the other one 
being a 20-story high-rise.

To set the table, the building is 6-stories over two basement levels and about 
165,000 GSF.  It will utilize steel pipe throughout as it's poured in place 
concrete with cloud ceilings and no ceilings in the dwelling units.  Three 
standpipe risers, one of which is partial height so multiple SP and sprinkler 
calc's.   It will also require booster pump for which no designated room or 
space is shown on the plans and one side of the building requires water 
curtains at balcony openings that I assume are too close to the adjacent 
building or property line, so another calc there plus the additional drafting 
and coordination.   And no two floors are typical to one another.   Although 
it's still not rocket science, there's some thinking involved and for those not 
familiar with SoCal, wages in LA are probably in the top 5 nationwide and City 
of LA is a wicked AHJ.   So I'm guessing that the FP contract is probably worth 
between $650-$700K.    Oh, and of course they need this absolutely, positively 
ASAP.

We looked at every task, optimized the hours for repetitions in the floor plans 
where we could, and crunched the numbers.   Our proposed fee was 18¢/SF and I 
thought that was fair.   The client came back and said that he's got another 
proposal for $5,000.      Five. Thousand.  Dollars.     Now some of you may 
think I'm the one with the wrong perspective but here's the thing:  our 
industry continues to basically give away its collective expertise and drag the 
value of its own work down.   No right-minded person would take this project at 
that fee in this market and this contractor is going to get their ass handed to 
them in both plan review and inspection, guaranteed.   When I mentioned the 
water curtains, the guy even said that there weren't any that he saw and he 
didn't include any "extras".      He doesn't have a flow test yet, doesn't have 
the CAD backgrounds ready to send and isn't even familiar with the complete set 
of work.   On top of that, he's inclined to accept the $5K proposal but 
wondered if I could cut my fee in half because he, "...would rather deal with a 
firm like (ours)..." than a moonlighter.    He actually seems like a pretty 
nice guy, albeit one who's now stuck in a mud bog up to his waist and wearing 
sunglasses at night.

My primary hope for 2022 is that our country stops fighting with itself.   My 
second one is that Covid somehow gets out of the way.   But my third hope is 
that our industry wakes up to the fact that what we do takes a certain amount 
of time and energy to learn what we know and that underselling (or in some 
cases giving away) our intellectual property is foolish and simply perpetuates 
the downward pressure on our market that's applied by developers, contractors 
and architects who know that if they kick far enough down the alley, they'll 
find someone who's willing to go CHEAP on fire protection for most projects.    
 Contractors who take on design/build projects have all the liability and risk, 
and navigating the plan review and inspection processes is harder than ever and 
will only get more rigorous.    Every year we hear the same complaints:   "We 
can't find enough designers";  "The quality of design work is bad industry 
wide"; "We're turning town work because we can't get it designed."   If you're 
putting 10-15¢ per SF on the sheet for design, that's your prerogative, but you 
don't get to complain about the lack or quality of resources if you do.   Fire 
protection design is a professional service, so paying a fair wage and 
providing benefits and furnishing the hardware/software resources to design 
technicians is essential to raising the standard of care and that all costs 
money.   If our industry isn't willing to pay itself fairly for professional 
caliber design, then why should the owners of the built environment?

Happy New Year to y'all and thanks to AFSA for continuing to foster this 
terrific venue for the exchange of ideas.

Steve