I'm engaged in a conversation with a project team where an Uninterrupted Power 
Supply is being added to a local small-scale broadcast facility (NPR 
affiliate).   The control rooms and studios are already protected by preaction 
and this battery stack is being added outside the building and a ways away from 
the existing preaction areas.   The two candidate designs are to extend the 
preaction or use a pre-engineered wet-chem system and I'd love for any and 
everyone who has experience with this type of hazard to chime in on whether 
there is a preferred or "best" practice.   My feeling is that a wet-chem system 
is the way to go and the most common practice - can anyone verify or do I have 
that wrong.

Fire away please...

Steve L.