Another issue I have locally is the utility telling me "you can turn it on
to test it, but you can't leave it on until inspected and the meter is
changed out". That is the extent of their policy. Nothing in writing, which
is what I am pushing for. What do other utils nationwide have? Formal
maximum
Out here, we usually need to wait, as many meters have been swapped for digital
flavored ones.
So, test system and turn off, so client doesn't get a cumulative bill for what
they normally use, plus the pv.
Aloha,
Keith
From: Kirk Herander
To: 'RE-wrenches'
2 matches
Mail list logo