Out here, we usually need to wait, as many meters have been swapped for digital
flavored ones.
So, test system and turn off, so client doesn't get a cumulative bill for what
they normally use, plus the pv.
Aloha,
Keith
________________________________
From: Kirk Herander <k...@vtsolar.com>
To: 'RE-wrenches' <re-wrenches@lists.re-wrenches.org>
Sent: Saturday, August 13, 2011 8:21 AM
Subject: [RE-wrenches] PV testing and turn-on /was mechanical vs. electronic
kwh meter
Another issue I have locally is the utility telling me “you can turn it on to
test it, but you can’t leave it on until inspected and the meter is changed
out”. That is the extent of their policy. Nothing in writing, which is what I
am pushing for. What do other utils nationwide have? Formal maximum turn-on /
test / turn-off time periods before inspection? In writing? Or seat of the
pants?
Kirk Herander
VT Solar, LLC
dba Vermont Solar Engineering
NABCEPTM Certified installer Charter Member
NYSERDA-eligible Installer
VT RE Incentive Program Partner
_______________________________________________
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenches.org
Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out participant bios:
www.members.re-wrenches.org
_______________________________________________
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenches.org
Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out participant bios:
www.members.re-wrenches.org