Out here, we usually need to wait, as many meters have been swapped for digital 
flavored ones.

So, test system and turn off, so client doesn't get a cumulative bill for what 
they normally use, plus the pv.
 
Aloha,


Keith


________________________________
From: Kirk Herander <k...@vtsolar.com>
To: 'RE-wrenches' <re-wrenches@lists.re-wrenches.org>
Sent: Saturday, August 13, 2011 8:21 AM
Subject: [RE-wrenches] PV testing and turn-on /was mechanical vs. electronic 
kwh meter


Another issue I have locally is the utility telling me “you can turn it on to 
test it, but you can’t leave it on until inspected and the meter is changed 
out”. That is the extent of their policy. Nothing in writing, which is what I 
am pushing for. What do other utils nationwide have? Formal maximum turn-on / 
test / turn-off time periods before inspection? In writing? Or seat of the 
pants?
 
Kirk Herander
VT Solar, LLC
dba Vermont Solar Engineering
NABCEPTM Certified installer Charter Member
NYSERDA-eligible Installer
VT RE Incentive Program Partner
_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org
_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to