Are there UL testing procedures for Grid-tied Battery Backup Systems, such
as the Xantrex XW systems and the Outback GVFX systems? The reason for my
inquiry is that the Los Angeles Department of Water and Power intends to
require that "...applicants installing Battery Backups on their solar
systems
Bob
since we've scheduled 2 days for the 400a upgrade and generator installation, a
8-12 hour static period for the batteries won't be a problem. I suspect that
the half day battery rest before testing VOC is not usually an option for most
installers on service calls so their diagnosis could be
Wrenches,
Xantrex' website now appears to include only products related to
their RV/mobile line, with Heart 458s and similar products. Their
document depot includes only manuals related to discontinued items
in these markets. While I have most inverter manuals etc. alrea
Hi Allan:
I too have found it difficult to find Xantrex and Trace owners manuals for
SW and XW products. I don't deal with C-40s or DRs much these days, luckily.
I did find a PDF at another site for the SW series manual,
www.aaasolar.com/ProdLit/Trace/SWManual.pdf .
Nick Soleil
Proje
Peter,
California utilities use to require operating steps (list not UL listing)
for all grid-tied systems in the interconnection application. A copy of the
operating steps from the equipment manual sufficed.
Joel Davidson
- Original Message -
From: "Peter Parrish"
To: "'RE-wrench
Here's a link Allen:
http://www.schneider-electric.com/sites/corporate/en/products-services/renewable-energies/products-offer/range-presentation.page?c_filepath=/templatedata/Offer_Presentation/3_Range_Datasheet/data/en/shared/renewable_energies/xantrex_xw.xml#
The manuals are under "tech publica
Thanks, Brian, I found that too. I prefer to use www.scroogle.com
than google...
But I couldn't find the remote display manual I needed (for fault
warning codes) and the documents I downloaded to copy had ridiculous
names (%5 etc.)
And nothing in Off-Grid a
Hello Peter, It was good to see you at the LADWP Commissioners Meeting even
though we didn't have time to talk. I told Mr. Benyamin, LADWP AGM, at the
meeting that there were no safety issues regarding grid-tie PV system with
batteries because the inverters were IEEE 929 compliant. He said he wa
Hi Joel,
I've seen a handful of Sunny Islands go in after the initial PV system is
installed. Six or seven. And I've seen Sunny Islands go in where there isn't
any PV. All but one of the ones that I've seen installed after the PV have
been permitted and inspected. ALL of these systems went in beca