Peter,

California utilities use to require operating steps (list not UL listing) for all grid-tied systems in the interconnection application. A copy of the operating steps from the equipment manual sufficed.

Joel Davidson

----- Original Message ----- From: "Peter Parrish" <peter.parr...@calsolareng.com>
To: "'RE-wrenches'" <re-wrenches@lists.re-wrenches.org>
Sent: Tuesday, October 05, 2010 4:05 AM
Subject: [RE-wrenches] UL and Grid-tied Battery Back Up Systems


Are there UL testing procedures for Grid-tied Battery Backup Systems, such
as the Xantrex XW systems and the Outback GVFX systems? The reason for my
inquiry is that the Los Angeles Department of Water and Power intends to
require that "...applicants installing Battery Backups on their solar
systems to submit an Operational Listing detailing a precise list of steps
of what were to happen if the LADWP grid were to lose power."

- Peter


Peter T. Parrish, Ph.D., President
California Solar Engineering, Inc.
820 Cynthia Ave., Los Angeles, CA 90065
CA Lic. 854779, NABCEP Cert. 031806-26
peter.parr...@calsolareng.com
Ph 323-258-8883, Mobile 323-839-6108, Fax 323-258-8885




_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to