From: Brian White
To: RE-wrenches ; RE-wrenches
Sent: Mon, December 21, 2009 2:12:54 PM
Subject: Re: [RE-wrenches] Solar System Certification
First of all, I think that our business model comes no where close to the norm
of the solar world. Our customers come to us through
-wrenches
Sent: Mon, December 21, 2009 2:12:54 PM
Subject: Re: [RE-wrenches] Solar System Certification
First of all, I think that our business model comes no where close to the norm
of the solar world. Our customers come to us through roofing channels, meaning
Eagle's primary foc
Title: Todd Cory
So William... are you
saying as a part of wrench survival we are expected to become glorified
electricians? I am not sure about your point. I think this thread
should move to the marketing list though.
Todd
William Miller wrote:
Todd:
Survival is about learning to adapt.
Todd:
Survival is about learning to adapt. Happiness is about learning to be
open minded.
William Miller
At 06:45 PM 12/21/2009, you wrote:
Who warranties the installation, you or the installer?
Who carries the liability insurance, you or the installer?
Who sells the materials and gets th
From: re-wrenches-boun...@lists.re-wrenches.org on behalf of
toddc...@finestplanet.com
Sent: Mon 12/21/2009 1:12 PM
To: RE-wrenches
Subject: Re: [RE-wrenches] Solar System Certification
So you can get others to install your designs? I would never touch materials I
do not sell, or install a
...@eagleroofing.com>
From: re-wrenches-boun...@lists.re-wrenches.org on behalf of
toddc...@finestplanet.com
Sent: Mon 12/21/2009 1:12 PM
To: RE-wrenches
Subject: Re: [RE-wrenches] Solar System Certification
So you can get others to install your designs? I would never touch mater
-5550
> e-mail: bri...@eagleroofing.com <mailto:bri...@eagleroofing.com>
>
>
>
>
>
> From: re-wrenches-boun...@lists.re-wrenches.org on behalf of William Miller
> Sent: Fri 12/18/2009 3:05 PM
> To: RE-wrenches
> Subject:
3:05 PM
To: RE-wrenches
Subject: Re: [RE-wrenches] Solar System Certification
Brian:
I looked up the Municipal Codes
(http://www.ci.yorba-linda.ca.us/~ci26/how-do-i/get/get-city-codes) and this
requirement is right in there. I hope you have a provision in your contract
that allows for addit
and
approve the system?
Joel Davidson
- Original Message -
From: "William Korthof"
To:
Sent: Saturday, December 19, 2009 7:43 AM
Subject: Re: [RE-wrenches] Solar System Certification
Yes, Yorba Linda technically requires an electrical PE stamp on PV
projects.
We've pr
William,
What about the "tested and approved" requirement? Does your PE also test and
approve the system?
Joel Davidson
- Original Message -
From: "William Korthof"
To:
Sent: Saturday, December 19, 2009 7:43 AM
Subject: Re: [RE-wrenches] Solar System Certif
f solar.
/wk
> - Original Message -
> From: William Miller
> To: RE-wrenches
> Sent: Friday, December 18, 2009 5:05 PM
> Subject: Re: [RE-wrenches] Solar System Certification
>
>
> Brian:
>
> I looked up the Municipal Codes
(http://www.ci.yo
k
- Original Message -
From: William Miller
To: RE-wrenches
Sent: Friday, December 18, 2009 5:05 PM
Subject: Re: [RE-wrenches] Solar System Certification
Brian:
I looked up the Municipal Codes (http://www.ci.yorba-linda.ca.us/~ci26/how-do-i/get/get-city-codes
) and this requirement i
Well that wasn't supposed to go out to the masses but...
So happy holidays anyway.
Jim Duncan
- Original Message -
From: North Texas Renewable Energy Inc
To: RE-wrenches
Sent: Friday, December 18, 2009 8:26 PM
Subject: Re: [RE-wrenches] Solar System Certification
Wi
Mark --
It doesn't sound like your crawl-space run is 'readily accessible' either.
Could you put a DC disconnect on the exterior before you go inside?
Rebecca Lundberg
Powefully Green, Minnesota
---
>
> Message: 1
> Date: Fri, 18 Dec 2009 16:24:30 -0700
> From:
levelheaded input.
Best regards
Jim Duncan
North Texas Renewable Energy
Fort Worth Texas
- Original Message -
From: William Miller
To: RE-wrenches
Sent: Friday, December 18, 2009 5:05 PM
Subject: Re: [RE-wrenches] Solar System Certification
Brian:
I looked up the Muni
Brian:
I looked up the Municipal Codes
(http://www.ci.yorba-linda.ca.us/~ci26/how-do-i/get/get-city-codes) and
this requirement is right in there. I hope you have a provision in your
contract that allows for additional billing for unanticipated engineering
fees. Everyone should. If you nee
I am curious if any of you have had to deal with this issue before.
The following is an item we got back from the City of Yorba Linda for a Plan
Check correction:
All electrical solar systems shall be tested and approved by a California
Registered Electrical Engineer. The engineer shall f
17 matches
Mail list logo