Hi,
I'm trying to use bacula to keep two independent sets of backups for
some particular machines. I have two storage daemons setup (one of them
offsite) so I can't use Migration or Copy Jobs.
My first try has been to setup a second set of jobs to do the backups to
the offsite location.
For exam
Julian & John,
* Fahrer, Julian [07/28/2009 17:14]:
>Two filesets should also work if i understood u right.
* Mike Ruskai [07/28/2009 17:17]
> I'm pretty sure Bacula considers the file set the backup unit of
> relevance here. Use two identical but differently-named FileSet
> definitions in
John,
* John Drescher [07/28/2009 16:52]:
> This is interesting to me. I did this a long while back (like 2 years
> ago) and it worked. I still have the configs in my bacula.
I'm using version 3.0.2, I assume you were using 2.something ?
Daniel.
* Kevin Keane [07/28/2009 21:51]:
> I didn't follow this thread, but there is a simple solution to this
> problem. You can generate the actual content of the file set with a
> script, and call the same script from within both file sets in the
> bacula configuration file.
Thanks, but in this ca
Kevin,
* Kevin Keane [07/28/2009 22:49]:
> the whole goal was. What I saw was that apparently you wanted to have
> two separate file sets (with different names, obviously) that both
> contain the exact same files - and needed a way to maintain it that way.
> Basically, you would end up with tw
Hi,
I have a weird configuration problem with bacula (3.0.2). I looked
through the manual, the faq and the mailing list archives, but my
searches couldn't come up with any relevant info.
If one of the jobs in my queue gets stuck "waiting for an appendable
volume" all the jobs after that one are b
* Dan Langille [01/13/2010 20:03]:
> I think you need to read up on 'concurrent jobs'.
> "If you want to run concurrent jobs you should keep these points in mind:
> * See Running Concurrent Jobs on how to setup concurrent jobs.
> * Bacula concurrently runs jobs of only one priority at a
Hi,
I'm trying to use Max Wait Time to abort jobs that are stuck waiting for
an appendable volume. From reading the mailing list and the manual my
understanding is that this should work starting from version 3.
In my case though the jobs are not cancelled, but they stay in the queue
and block all
Hi,
I've been using InitCatalog and Verify jobs to monitor my production
machines. This seems to work very well when there are modified files.
However if a new files appears in one of the monitored directories then
all the files from then on will be reported at the same time as missing
and as new
Hi,
I have the following RunScript directive in my jobdefs to notify nagios
about the status of backups:
RunScript {
Command = "/usr/local/sbin/bacula2nagios.sh \"%n\" \"%e\" \"%e %l %v\""
RunsWhen = After
RunsOnFailure = yes
RunsOnClient = no
RunsOnSuccess
quot;accurate backup" feature was implemented in
> 3.0.0.
> (i don't know if this causes the problem, but it is my favourite candidate
> for that :) )
>
> someone should file a bug report :)
>
> Thomas
>
>
>
> Daniel De Marco schrieb:
> > Hi,
> >
FYI: Kern added a patch that fixes the problem. It is attached to the
bug report at http://bugs.bacula.org/view.php?id=1524
Daniel.
* Daniel De Marco [03/05/2010 16:13]:
> I just updated to 5.0.1 and I can confirm the problem is still present.
>
> I also filed the report a
Hi,
I just tested the patch at:
http://bugs.bacula.org/view.php?id=1526
and it works fine and solves the problem in my case.
Thank you.
Daniel.
* Daniel De Marco [03/05/2010 12:54]:
> Hi,
>
> I have the following RunScript directive in my jobdefs to notify nagios
> about t
Ben,
* Ben Walton [06/16/2011 11:27]:
> Thanks for this info. It helps. I was just hoping that I wasn't
> missing some setting that made the staggering dynamically
> configurable.
my plan was to use "Max Full Interval" to solve this problem, but I
didn't test it yet. In principle if you set it
* Ben Walton [06/16/2011 14:03]:
> This is interesting, but I'm not sure I understand how it would remain
> staggered.
>
> Say my schedule is:
>
> Schedule {
> Name = "MonthlyCycle"
> Run = Full 1st sun at 23:05
> Run = Differential 2nd-5th sun at 23:05
> Run = Incremental mon-sat at 23:
15 matches
Mail list logo