On 12/27/2016 5:26 AM, Robert Schulz wrote:
> Hello
>
> ...
>
> Is there a possibility to disable the schedule of such jobs (or named
> jobs) as long as base jobs are running?
> Maybe is there a possibility to define an exception (NOT RUN action)?
> I want to avoid to define complex schedules whe
Hello
My backup location has a limited bandwith. I use dedup to low down the
impact of the limited bandwith.
I plan to run base jobs 2 times a year. Now between 24th and 27th of
December I run about 8 base which backup nearly 1TB of data.
The schdules looks like:
Schedule {
Name = "Sched_Fir