Hi all,
I have a incremental backup schedule job. After i rebuild TSM database because
the disk crash, the time take for this backup job form 10 minutes to 3 hours.
How did it happen?
Max
Hi all,
l have a storage pool can't peform the reclamation. It just only can use the
"move data" command to manually reclaim the tape. How can l solve this problem?
Max
egards,
Gerald Wichmann
Senior Systems Development Engineer
Zantaz, Inc.
925.598.3099 (w)
-Original Message-
From: Max Kwong [mailto:[EMAIL PROTECTED]]
Sent: Tuesday, June 04, 2002 9:47 PM
To: [EMAIL PROTECTED]
Subject: Can't do reclamation
Hi all,
l have a storage pool can't peform
Hi all,
I've a schedule incemental backup processing time is much more than the others.
The followings is the details of the schedule result.
Normal Schedule Processing Time: 3 minutes
05/25/2002 04:56:57 --
Eric
-Original Message-
From: Max Kwong [mailto:[EMAIL PROTECTED]]
Sent: Wednesday, June 05, 2002 10:41 PM
To: [EMAIL PROTECTED]
Subject: Re: Can't do reclamation
Hi all,
Thanks for all reply. Here is the details of the storage pool that can't perform
reclamatoin.
Volume N
Hi,
Both node is in Windows NT - Version 4, Release 1, Level 1.0 . The client and
server are in the same machine. And the db cache hit pct. is 97.7%.
Regards,
Max Kwong
Gerald Wichmann <[EMAIL PROTECTED]> on 06/07/2002 12:41:18 AM
Please respond to "ADSM: Dist Stor Manag
Hi all,
Can i create two client schedule at the same dtart time on one client node.
Becase i want to backup two different drive at the same time. I've tried to
create the schedules but one always missing the job. How can l solve it.
Regards,
Max Kwong
t volume ADSM02 closed.
ANR8336I Verifying label of DLT volume ADSM02 in drive MT1.0.0.1 (MT1.0.0.1).
==
Best Regards,
Max Kwong