Wow.  Reading through your document, I guess I've missed out on a lot of
wire management issues by doing mostly ground mounts with my halfcut
modules -- no MLPE, and just running the wires in the third rail.

I actually like the half cut modules a lot better for production in the
winter because when I get snow covering just the bottom edge of an array,
the top part still works at half amperage -- much better than the old 60
cell modules where I'd often have a few inches of snow hanging on the
bottom cell line, blocking all three of the bypass sections.   Usually I
find myself on the other end... where equipment is designed with everything
except winter off grid systems.  Interesting that in this case, it's
actually good for my situation, by chance.

Zeke
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to