Hello Wrenches,
An off grid, Radian / Mate 3 system we set up some years back has worked
flawlessly. The client is now reporting that his system will only go
into absorption charge for 1 hour per calendar day. The setting was
previously to absorb for 2 hours.
He has tried shutting off the generator and then restarting. The
inverter will connect, but not go into absorb.
During this cloudy period, he is only able to get the batteries to about
80 percent before he needs to leave the site for a week or so.
I finally go through to Outback, and they think it is a Firmware
problem. As it is a long drive out, it seems worth while to run it by
the list. Does FW this seem like the issue?
Thank you,
Drake
--
_______________________________________________
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm
Check out or update participant bios:
http://www.members.re-wrenches.org